A platform for research: civil engineering, architecture and urbanism
Profile steel pile feeder
The invention provides a profile steel pile feeder, and belongs to the technical field of pile feeders. The profile steel pile feeder comprises a chuck component and a dowel bar component. The chuck component comprises a butt-joint steel plate and a clamping mouth piece, the clamping mouth piece movably clamps and presses the top end of external profile steel, the top end of the clamping mouth piece is connected and fixed to the butt-joint steel plate, the dowel bar component comprises a dowel bar A, a dowel bar B and a dowel bar C, the dowel bar A is detachably connected and fixed to the top end of the butt-joint steel plate, and the dowel bar C is detachably connected and fixed to the top end of the butt-joint steel plate. The two ends of the dowel bar B are fixed to the opposite faces of the dowel bar A and the dowel bar C correspondingly, and the top end of the dowel bar C is fixed to an external mechanical arm. The clamping mouth piece clamps the top end of the profile steel, the mechanical arm exerts force to assist the clamping mouth piece to press the profile steel downwards so that the profile steel can be inserted into a designated position in a foundation, after the profile steel is inserted into the designated depth, the mechanical arm is utilized again to drive the assembled vertical rod to move upwards so that the clamping mouth piece can be separated from the profile steel, and therefore the construction time is shortened, and the fatigue degree is reduced.
本申请提供了一种型钢送桩器,属于送桩器技术领域。该型钢送桩器,包括夹头构件和传力杆构件。所述夹头构件包括对接钢板和夹嘴件,所述夹嘴件活动夹持并按压于外界的型钢顶端,且其顶端衔接固定于所述对接钢板,所述传力杆构件包括传力杆A和传力杆B以及传力杆C,所述传力杆A可拆式衔接固定于所述对接钢板顶端,所述传力杆B的两端分别与传力杆A和传力杆C的相对面固定,且传力杆C的顶端与外界的机械臂固定。在本申请中夹嘴件夹持住型钢顶端,借助机械臂施力协助夹嘴件下压型钢使其插入地基内指定位置,而当插入直指定深度后,重新利用机械臂带动组和成的竖杆上移即可使得夹嘴件与型钢脱离,由此缩短了施工的时间和劳累程度。
Profile steel pile feeder
The invention provides a profile steel pile feeder, and belongs to the technical field of pile feeders. The profile steel pile feeder comprises a chuck component and a dowel bar component. The chuck component comprises a butt-joint steel plate and a clamping mouth piece, the clamping mouth piece movably clamps and presses the top end of external profile steel, the top end of the clamping mouth piece is connected and fixed to the butt-joint steel plate, the dowel bar component comprises a dowel bar A, a dowel bar B and a dowel bar C, the dowel bar A is detachably connected and fixed to the top end of the butt-joint steel plate, and the dowel bar C is detachably connected and fixed to the top end of the butt-joint steel plate. The two ends of the dowel bar B are fixed to the opposite faces of the dowel bar A and the dowel bar C correspondingly, and the top end of the dowel bar C is fixed to an external mechanical arm. The clamping mouth piece clamps the top end of the profile steel, the mechanical arm exerts force to assist the clamping mouth piece to press the profile steel downwards so that the profile steel can be inserted into a designated position in a foundation, after the profile steel is inserted into the designated depth, the mechanical arm is utilized again to drive the assembled vertical rod to move upwards so that the clamping mouth piece can be separated from the profile steel, and therefore the construction time is shortened, and the fatigue degree is reduced.
本申请提供了一种型钢送桩器,属于送桩器技术领域。该型钢送桩器,包括夹头构件和传力杆构件。所述夹头构件包括对接钢板和夹嘴件,所述夹嘴件活动夹持并按压于外界的型钢顶端,且其顶端衔接固定于所述对接钢板,所述传力杆构件包括传力杆A和传力杆B以及传力杆C,所述传力杆A可拆式衔接固定于所述对接钢板顶端,所述传力杆B的两端分别与传力杆A和传力杆C的相对面固定,且传力杆C的顶端与外界的机械臂固定。在本申请中夹嘴件夹持住型钢顶端,借助机械臂施力协助夹嘴件下压型钢使其插入地基内指定位置,而当插入直指定深度后,重新利用机械臂带动组和成的竖杆上移即可使得夹嘴件与型钢脱离,由此缩短了施工的时间和劳累程度。
Profile steel pile feeder
一种型钢送桩器
LI GONGMING (author) / LI QINGSONG (author) / FAN MIN (author) / LI YONGJUN (author) / SHEN XIA (author) / WANG XIAOQIANG (author)
2022-05-13
Patent
Electronic Resource
Chinese
IPC:
E02D
FOUNDATIONS
,
Gründungen
European Patent Office | 2020
|Integrated pile feeder and pile sinking construction method
European Patent Office | 2024
|Pile feeder structure for assisting pile sinking construction
European Patent Office | 2024
|