A platform for research: civil engineering, architecture and urbanism
The mounting structure comprises a wall top, a fixed longitudinal beam is arranged at the bottom of the wall top, a first cross beam is arranged on the side, close to the center of the wall top, of the bottom of the fixed longitudinal beam, and a second cross beam is arranged on the side, away from the center of the wall top, of the bottom of the fixed longitudinal beam; a first steel column is arranged at the center of the bottom of the first cross beam, a mounting mechanism is arranged on the outer surface of the top of the first steel column, and second steel columns are arranged at the front end and the rear end of the bottom of the second cross beam. Through the arrangement of the mounting mechanism, under the action of the fixing sleeve and the supporting rod, the stability of the connecting position of the first steel column and the second cross beam can be improved, a triangular stable structure is adopted, the wind resistance is enhanced, the situation of unstable mounting is avoided, and through the use of a mounting shell, connection between the first steel column and the second cross beam is simple and convenient; and the disassembly is convenient.
本发明公开了钢结构房顶用悬挂张拉丝杆的安装结构,包括墙顶,所述墙顶的底部设置有固定纵梁,所述固定纵梁的底部靠近墙顶中心的一侧设置有第一横梁,所述固定纵梁的底部远离墙顶中心的一侧设置有第二横梁,所述第一横梁的底部中心处设置有第一钢柱,所述第一钢柱顶部的外表面设置有安装机构,所述第二横梁底部的前后两端均设置有第二钢柱。通过安装机构的设置,能够在固定套和支撑杆的作用下,增加第一钢柱与第二横梁连接处的稳定性,采用三角形的稳定结构,增强其抗风性,避免出现安装不稳定的情况,并且通过安装壳的使用,使得第一钢柱与第二横梁之间的连接简便,并便于拆卸。
The mounting structure comprises a wall top, a fixed longitudinal beam is arranged at the bottom of the wall top, a first cross beam is arranged on the side, close to the center of the wall top, of the bottom of the fixed longitudinal beam, and a second cross beam is arranged on the side, away from the center of the wall top, of the bottom of the fixed longitudinal beam; a first steel column is arranged at the center of the bottom of the first cross beam, a mounting mechanism is arranged on the outer surface of the top of the first steel column, and second steel columns are arranged at the front end and the rear end of the bottom of the second cross beam. Through the arrangement of the mounting mechanism, under the action of the fixing sleeve and the supporting rod, the stability of the connecting position of the first steel column and the second cross beam can be improved, a triangular stable structure is adopted, the wind resistance is enhanced, the situation of unstable mounting is avoided, and through the use of a mounting shell, connection between the first steel column and the second cross beam is simple and convenient; and the disassembly is convenient.
本发明公开了钢结构房顶用悬挂张拉丝杆的安装结构,包括墙顶,所述墙顶的底部设置有固定纵梁,所述固定纵梁的底部靠近墙顶中心的一侧设置有第一横梁,所述固定纵梁的底部远离墙顶中心的一侧设置有第二横梁,所述第一横梁的底部中心处设置有第一钢柱,所述第一钢柱顶部的外表面设置有安装机构,所述第二横梁底部的前后两端均设置有第二钢柱。通过安装机构的设置,能够在固定套和支撑杆的作用下,增加第一钢柱与第二横梁连接处的稳定性,采用三角形的稳定结构,增强其抗风性,避免出现安装不稳定的情况,并且通过安装壳的使用,使得第一钢柱与第二横梁之间的连接简便,并便于拆卸。
Mounting structure of suspension tensioning lead screw for steel structure roof
钢结构房顶用悬挂张拉丝杆的安装结构
WU XIUWEN (author)
2022-05-13
Patent
Electronic Resource
Chinese
Stainless steel roof structure and stainless steel roof structure mounting method
European Patent Office | 2024
|Walking high-altitude suspension platform for mounting steel structure roof inner plate
European Patent Office | 2024
|Steel structure workshop roof mounting structure and mounting method thereof
European Patent Office | 2024
|