A platform for research: civil engineering, architecture and urbanism
Cement precast pile connecting piece
The invention relates to the field of precast pile installation, in particular to a cement precast pile connecting piece which comprises a fixing mechanism, a reinforcing mechanism, a linkage mechanism and a joining mechanism. Each penetrating through hole is composed of two intersecting through holes, the steel bars of the precast piles at the upper end and the lower end are inserted into the same penetrating through hole, the two steel bars do not abut against each other or interfere with each other and are provided with coincident parts, and therefore the strength of the connecting position is enhanced. The poured cement is guided into the penetrating through holes through the pouring straightway and the pouring channel, so that the reinforcing steel bars inserted into the penetrating through holes are subjected to cement fixation; when the limiting sliding rod moves in the penetrating through hole direction, the reinforcing hammer head extrudes the reinforcing steel bar inserted into the reinforcing hammer head to the side wall, so that the reinforcing steel bar is fixed, and the connection stability is enhanced; all the components of the reinforcing mechanism are connected through the linkage mechanism, so that all the components of the reinforcing mechanism are synchronized, and the situation that the reinforcing mechanism cannot achieve the reinforcing function due to the fact that a single component does not work is prevented.
本发明涉及预制桩安装领域,具体说是一种水泥预制桩连接件,包括固定机构、加固机构、联动机构和衔接机构;穿接通孔由两个相交的通孔组成,上下两端的预制桩的钢筋插接在同一个穿接通孔中,两根钢筋既不会互相抵触干扰,又具备重合的部分,从而加强连接位置的强度;通过浇筑直道和浇筑通道将浇筑的水泥导流到穿接通孔中,从而对插接其中的钢筋进行水泥固定;当限位滑杆向穿接通孔方向移动时,加固锤头将插接其中的钢筋向侧壁挤压,从而将钢筋进行固定,加强连接稳固性;通过联动机构将加固机构各组件进行连接,从而将所有加固机构组件完成同步,防止单个组件不起作用从而使得加固机构无法实现加固功能。
Cement precast pile connecting piece
The invention relates to the field of precast pile installation, in particular to a cement precast pile connecting piece which comprises a fixing mechanism, a reinforcing mechanism, a linkage mechanism and a joining mechanism. Each penetrating through hole is composed of two intersecting through holes, the steel bars of the precast piles at the upper end and the lower end are inserted into the same penetrating through hole, the two steel bars do not abut against each other or interfere with each other and are provided with coincident parts, and therefore the strength of the connecting position is enhanced. The poured cement is guided into the penetrating through holes through the pouring straightway and the pouring channel, so that the reinforcing steel bars inserted into the penetrating through holes are subjected to cement fixation; when the limiting sliding rod moves in the penetrating through hole direction, the reinforcing hammer head extrudes the reinforcing steel bar inserted into the reinforcing hammer head to the side wall, so that the reinforcing steel bar is fixed, and the connection stability is enhanced; all the components of the reinforcing mechanism are connected through the linkage mechanism, so that all the components of the reinforcing mechanism are synchronized, and the situation that the reinforcing mechanism cannot achieve the reinforcing function due to the fact that a single component does not work is prevented.
本发明涉及预制桩安装领域,具体说是一种水泥预制桩连接件,包括固定机构、加固机构、联动机构和衔接机构;穿接通孔由两个相交的通孔组成,上下两端的预制桩的钢筋插接在同一个穿接通孔中,两根钢筋既不会互相抵触干扰,又具备重合的部分,从而加强连接位置的强度;通过浇筑直道和浇筑通道将浇筑的水泥导流到穿接通孔中,从而对插接其中的钢筋进行水泥固定;当限位滑杆向穿接通孔方向移动时,加固锤头将插接其中的钢筋向侧壁挤压,从而将钢筋进行固定,加强连接稳固性;通过联动机构将加固机构各组件进行连接,从而将所有加固机构组件完成同步,防止单个组件不起作用从而使得加固机构无法实现加固功能。
Cement precast pile connecting piece
一种水泥预制桩连接件
LI SHUO (author) / SUN LEQIANG (author)
2022-05-17
Patent
Electronic Resource
Chinese
IPC:
E02D
FOUNDATIONS
,
Gründungen
Precast pile connecting piece, precast pile connecting structure and precast pile thereof
European Patent Office | 2022
|Cement precast pile connecting piece and construction method
European Patent Office | 2024
|