A platform for research: civil engineering, architecture and urbanism
Plugging device for floating transportation of offshore large-diameter steel pile and construction method
The invention discloses a plugging device for floating transportation of an offshore large-diameter steel pile and a construction method.The plugging device is composed of a guide block, a lining ring, a sealing device, a buoy, a clamping fixture, a torsion limiting floating box and a control module, and fixing and clamping are achieved through the clamping fixture and the end wall of the steel pile; two sets of sealing devices are arranged in the annular direction where the plugging device makes contact with the interior of the steel pile, the steel pile forms a watertight buoy, and the offshore floating transportation requirement is met; torsion limiting buoyancy tanks which are symmetrically arranged left and right are arranged at the rear end of the plugging device, so that the steel piles can be prevented from being twisted in water during transportation; by means of the gas injection sealing device, good joint filling adaptability is achieved, roundness deformation of the steel pile can be adapted, and sealing is reliable; the control module can realize remote operation, the release operation is simple, and quick release can be realized; the whole set of plugging device is simple in structure, convenient to install and operate, capable of effectively plugging external seawater and preventing the seawater from entering the steel pile, good in installation adaptability, easy to manufacture and good in economical efficiency.
本发明公开了一种用于海上大直径钢桩浮运的封堵装置及施工方法,封堵装置由导向块、衬圈、密封装置、浮筒、夹紧卡具、限扭浮箱、控制模块组成,通过夹紧卡具与钢桩端壁实现固定夹紧,封堵装置与钢桩内部接触的环形方向设置有两套密封装置,将钢桩其形成一个水密的浮筒,满足海上浮运需要;在封堵装置后端设置有左右对称布置的限扭浮箱,能够防止钢桩运输时的水中扭转;通过注气的密封装置,有较好的填缝适应性,能够适应钢桩的圆度形变,密封可靠;控制模块可实现远程操作,解脱操作简单,可以快速脱开;成套的封堵装置结构简单,安装操作方便,能够有效封堵外部海水,防止海水进入钢桩内部,具有良好的安装适应性,制造简单,经济性好。
Plugging device for floating transportation of offshore large-diameter steel pile and construction method
The invention discloses a plugging device for floating transportation of an offshore large-diameter steel pile and a construction method.The plugging device is composed of a guide block, a lining ring, a sealing device, a buoy, a clamping fixture, a torsion limiting floating box and a control module, and fixing and clamping are achieved through the clamping fixture and the end wall of the steel pile; two sets of sealing devices are arranged in the annular direction where the plugging device makes contact with the interior of the steel pile, the steel pile forms a watertight buoy, and the offshore floating transportation requirement is met; torsion limiting buoyancy tanks which are symmetrically arranged left and right are arranged at the rear end of the plugging device, so that the steel piles can be prevented from being twisted in water during transportation; by means of the gas injection sealing device, good joint filling adaptability is achieved, roundness deformation of the steel pile can be adapted, and sealing is reliable; the control module can realize remote operation, the release operation is simple, and quick release can be realized; the whole set of plugging device is simple in structure, convenient to install and operate, capable of effectively plugging external seawater and preventing the seawater from entering the steel pile, good in installation adaptability, easy to manufacture and good in economical efficiency.
本发明公开了一种用于海上大直径钢桩浮运的封堵装置及施工方法,封堵装置由导向块、衬圈、密封装置、浮筒、夹紧卡具、限扭浮箱、控制模块组成,通过夹紧卡具与钢桩端壁实现固定夹紧,封堵装置与钢桩内部接触的环形方向设置有两套密封装置,将钢桩其形成一个水密的浮筒,满足海上浮运需要;在封堵装置后端设置有左右对称布置的限扭浮箱,能够防止钢桩运输时的水中扭转;通过注气的密封装置,有较好的填缝适应性,能够适应钢桩的圆度形变,密封可靠;控制模块可实现远程操作,解脱操作简单,可以快速脱开;成套的封堵装置结构简单,安装操作方便,能够有效封堵外部海水,防止海水进入钢桩内部,具有良好的安装适应性,制造简单,经济性好。
Plugging device for floating transportation of offshore large-diameter steel pile and construction method
一种用于海上大直径钢桩浮运的封堵装置及施工方法
MENG XIANLIN (author) / LI XIAOBAI (author) / CHEN WEI (author)
2022-05-24
Patent
Electronic Resource
Chinese
IPC:
E02D
FOUNDATIONS
,
Gründungen
Floating transportation construction method of large-diameter single pile
European Patent Office | 2020
|Offshore wind plant steel pipe pile floating transportation device
European Patent Office | 2015
|Supporting pile inter-pile plugging device and plugging construction method
European Patent Office | 2024
|Offshore platform large-diameter hectometer socketed pile combined pile-forming construction method
European Patent Office | 2023
|Offshore steel pipe pile transportation device and transportation method
European Patent Office | 2023
|