A platform for research: civil engineering, architecture and urbanism
Cement-soil pile construction equipment
The invention discloses cement-soil pile construction equipment, and aims to provide the cement-soil pile construction equipment which can reduce manual operation, reduce labor intensity and improve construction efficiency of tunnel reinforcement. The high-pressure jet grouting pile machine comprises a jet grouting drill rod, a frame, a supporting tower rod arranged on the frame, a first guide rail arranged on the supporting tower rod, a sliding seat sliding along the first guide rail, a sliding seat movement executing mechanism used for driving the sliding seat and a rotating power head arranged on the sliding seat. The jet grouting drill rod comprises a drill body and a drill rod tail connected with the upper end of the drill body. The drill body is composed of a plurality of connecting drill pipes connected in sequence. The walking vehicle is provided with a mounting platform, and the high-pressure jet grouting pile machine is mounted on the mounting platform through a vehicle frame; and the automatic drill pipe mounting device comprises a drill pipe placing frame and a manipulator which are arranged on the mounting platform, and the drill pipe placing frame is used for placing a connecting drill pipe of the rotary spraying drill pipe.
本发明公开了一种水泥土桩施工设备,旨在提供一种能够减少人工操作,降低劳动强度,并提高隧道加固的施工效率的水泥土桩施工设备。它包括高压旋喷桩机,高压旋喷桩机包括旋喷钻杆、车架、设置在车架上的支撑塔杆、设置在支撑塔杆上的第一导轨、沿第一导轨滑动的滑动座、用于驱动滑动座的滑动座移动执行机构及设置在滑动座上的旋转动力头,旋喷钻杆包括钻身及与钻身上端连接的钻杆尾部,钻身由若干段依次连接的连接钻管组成;行走车,行走车上设有安装平台,所述高压旋喷桩机通过车架安装在安装平台上;钻管自动安装装置,钻管自动安装装置包括设置在安装平台上的钻管放置架及机械手,其中钻管放置架用于放置旋喷钻杆的连接钻管。
Cement-soil pile construction equipment
The invention discloses cement-soil pile construction equipment, and aims to provide the cement-soil pile construction equipment which can reduce manual operation, reduce labor intensity and improve construction efficiency of tunnel reinforcement. The high-pressure jet grouting pile machine comprises a jet grouting drill rod, a frame, a supporting tower rod arranged on the frame, a first guide rail arranged on the supporting tower rod, a sliding seat sliding along the first guide rail, a sliding seat movement executing mechanism used for driving the sliding seat and a rotating power head arranged on the sliding seat. The jet grouting drill rod comprises a drill body and a drill rod tail connected with the upper end of the drill body. The drill body is composed of a plurality of connecting drill pipes connected in sequence. The walking vehicle is provided with a mounting platform, and the high-pressure jet grouting pile machine is mounted on the mounting platform through a vehicle frame; and the automatic drill pipe mounting device comprises a drill pipe placing frame and a manipulator which are arranged on the mounting platform, and the drill pipe placing frame is used for placing a connecting drill pipe of the rotary spraying drill pipe.
本发明公开了一种水泥土桩施工设备,旨在提供一种能够减少人工操作,降低劳动强度,并提高隧道加固的施工效率的水泥土桩施工设备。它包括高压旋喷桩机,高压旋喷桩机包括旋喷钻杆、车架、设置在车架上的支撑塔杆、设置在支撑塔杆上的第一导轨、沿第一导轨滑动的滑动座、用于驱动滑动座的滑动座移动执行机构及设置在滑动座上的旋转动力头,旋喷钻杆包括钻身及与钻身上端连接的钻杆尾部,钻身由若干段依次连接的连接钻管组成;行走车,行走车上设有安装平台,所述高压旋喷桩机通过车架安装在安装平台上;钻管自动安装装置,钻管自动安装装置包括设置在安装平台上的钻管放置架及机械手,其中钻管放置架用于放置旋喷钻杆的连接钻管。
Cement-soil pile construction equipment
水泥土桩施工设备
LI JIAZHENG (author) / HU LI (author) / LEI XIAOFENG (author) / WU KESHAN (author) / KUANG HAILONG (author)
2022-05-24
Patent
Electronic Resource
Chinese
Flexible energy pile construction equipment based on cement-soil mixing pile
European Patent Office | 2023
|Cement-soil mixing pile construction system and method and cement-soil mixing pile
European Patent Office | 2023
|