A platform for research: civil engineering, architecture and urbanism
According to the underground stereo garage and the construction method, the underground stereo garage comprises a bottom layer and a top layer, the bottom layer is fixedly connected with the top layer through side walls, an interlayer is fixedly arranged between the bottom layer and the top layer, and the interlayer comprises at least one clamping plate; a through-height traffic lane or a through-height interval is arranged between each clamping plate and the corresponding side wall, and/or a through-height traffic lane or a through-height interval is arranged between every two adjacent clamping plates; an upper parking unit is arranged on the clamping plate, and a lower parking unit is arranged on the bottom layer; a connecting column is arranged between the bottom layer and the top layer, the connecting column is of a prefabricated structure, and/or the clamping plate is of a prefabricated structure, and/or the top layer is of a prefabricated structure. The connecting columns are of a prefabricated structure, and/or the clamping plates are of a prefabricated structure, and/or the top layer is of a prefabricated structure, automatic production can be achieved, and the manufacturing quality, efficiency and precision are effectively improved.
一种地下立体车库及施工方法,所述地下立体停车库包括底层和顶层,所述底层通过侧壁与顶层固定连接,所述底层与顶层之间固定设置有夹层,所述夹层包括至少一个夹板;所述夹板与侧壁之间设置有通高通车道或通高间隔,和/或相邻两个夹板之间设置有通高通车道或通高间隔;所述夹板上设置有上停车单元,所述底层上设置有下停车单元;所述底层和顶层之间设置有连接柱,所述连接柱为预制结构,和/或所述夹板为预制结构,和/或所述顶层为预制结构。所述连接柱为预制结构,和/或所述夹板为预制结构,和/或所述顶层为预制结构,可以实现自动化生产,有效的提高了制造的质量、效率和精度。
According to the underground stereo garage and the construction method, the underground stereo garage comprises a bottom layer and a top layer, the bottom layer is fixedly connected with the top layer through side walls, an interlayer is fixedly arranged between the bottom layer and the top layer, and the interlayer comprises at least one clamping plate; a through-height traffic lane or a through-height interval is arranged between each clamping plate and the corresponding side wall, and/or a through-height traffic lane or a through-height interval is arranged between every two adjacent clamping plates; an upper parking unit is arranged on the clamping plate, and a lower parking unit is arranged on the bottom layer; a connecting column is arranged between the bottom layer and the top layer, the connecting column is of a prefabricated structure, and/or the clamping plate is of a prefabricated structure, and/or the top layer is of a prefabricated structure. The connecting columns are of a prefabricated structure, and/or the clamping plates are of a prefabricated structure, and/or the top layer is of a prefabricated structure, automatic production can be achieved, and the manufacturing quality, efficiency and precision are effectively improved.
一种地下立体车库及施工方法,所述地下立体停车库包括底层和顶层,所述底层通过侧壁与顶层固定连接,所述底层与顶层之间固定设置有夹层,所述夹层包括至少一个夹板;所述夹板与侧壁之间设置有通高通车道或通高间隔,和/或相邻两个夹板之间设置有通高通车道或通高间隔;所述夹板上设置有上停车单元,所述底层上设置有下停车单元;所述底层和顶层之间设置有连接柱,所述连接柱为预制结构,和/或所述夹板为预制结构,和/或所述顶层为预制结构。所述连接柱为预制结构,和/或所述夹板为预制结构,和/或所述顶层为预制结构,可以实现自动化生产,有效的提高了制造的质量、效率和精度。
Underground stereo garage and construction method
一种地下立体车库及施工方法
SONG NING (author)
2022-05-27
Patent
Electronic Resource
Chinese
European Patent Office | 2016
|