Optimized construction method for outer wall connecting piece
The invention provides an optimized construction method for an outer wall connecting piece, the outer wall connecting piece comprises an outer frame vertical rod, a shear wall, a pre-buried pipe, a horizontal cross rod and a wall connecting piece, the pre-buried pipe is pre-buried in the shear wall, one end of the wall connecting piece penetrates through the pre-buried pipe, and the end, penetrating through the pre-buried pipe, of the wall connecting piece is pulled and locked through the horizontal cross rod; the construction method comprises the steps that the embedded pipe of the corresponding size is manufactured according to the thickness of the shear wall, and the size of the embedded pipe needs to be checked after manufacturing is completed; sending the technical disclosure to constructors in a written form; precise paying-off positioning is carried out according to the distance size of the pre-buried pipes which are technically explained, constructors install the pre-buried pipes into a formwork of a shear wall to be reinforced stably, it is guaranteed that the pre-buried pipes cannot deviate and fall off during concrete pouring, the wall connecting piece pulling joints can be arranged according to standard requirements, and the pre-buried pipes can be used in a turnover mode.
本发明提供一种外墙连墙件优化施工方法,包括外墙连墙件,所述外墙连墙件包括外架立杆、剪力墙、预埋管、水平横杆和连墙件,所述预埋管预埋在剪力墙内部,所述连墙件一端穿过预埋管,且连墙件穿过预埋管的一端通过水平横杆拉结锁死,所述外架立杆与连墙件拉结固定,其施工方法包括根据剪力墙的厚度制作相应尺寸的预埋管,且制作完成后需要对预埋管的尺寸进行核验;将技术交底以书面形式发送到施工人员;按照技术交底的预埋管间距尺寸进行精确的放线定位,施工人员将预埋的预埋管安装到剪力墙的模板内部加固稳定,确保混凝土浇筑时预埋管不会出现偏移掉落,该发明连墙件拉结点可按规范要求布设,且预埋件可周转使用。
Optimized construction method for outer wall connecting piece
The invention provides an optimized construction method for an outer wall connecting piece, the outer wall connecting piece comprises an outer frame vertical rod, a shear wall, a pre-buried pipe, a horizontal cross rod and a wall connecting piece, the pre-buried pipe is pre-buried in the shear wall, one end of the wall connecting piece penetrates through the pre-buried pipe, and the end, penetrating through the pre-buried pipe, of the wall connecting piece is pulled and locked through the horizontal cross rod; the construction method comprises the steps that the embedded pipe of the corresponding size is manufactured according to the thickness of the shear wall, and the size of the embedded pipe needs to be checked after manufacturing is completed; sending the technical disclosure to constructors in a written form; precise paying-off positioning is carried out according to the distance size of the pre-buried pipes which are technically explained, constructors install the pre-buried pipes into a formwork of a shear wall to be reinforced stably, it is guaranteed that the pre-buried pipes cannot deviate and fall off during concrete pouring, the wall connecting piece pulling joints can be arranged according to standard requirements, and the pre-buried pipes can be used in a turnover mode.
本发明提供一种外墙连墙件优化施工方法,包括外墙连墙件,所述外墙连墙件包括外架立杆、剪力墙、预埋管、水平横杆和连墙件,所述预埋管预埋在剪力墙内部,所述连墙件一端穿过预埋管,且连墙件穿过预埋管的一端通过水平横杆拉结锁死,所述外架立杆与连墙件拉结固定,其施工方法包括根据剪力墙的厚度制作相应尺寸的预埋管,且制作完成后需要对预埋管的尺寸进行核验;将技术交底以书面形式发送到施工人员;按照技术交底的预埋管间距尺寸进行精确的放线定位,施工人员将预埋的预埋管安装到剪力墙的模板内部加固稳定,确保混凝土浇筑时预埋管不会出现偏移掉落,该发明连墙件拉结点可按规范要求布设,且预埋件可周转使用。
Optimized construction method for outer wall connecting piece
一种外墙连墙件优化施工方法
CHEN MINGDONG (author) / WANG ZHIZHONG (author) / JIA YOUHENG (author) / DU QI (author) / REN XIAOFEI (author) / LIN XIANGJUN (author) / LIU KAIRUI (author) / YAN DECHENG (author)
2022-05-27
Patent
Electronic Resource
Chinese
IPC:
E04G
SCAFFOLDING
,
Baugerüste
European Patent Office | 2023
|Wall connecting piece for outer curtain wall construction
European Patent Office | 2024
|Outer frame wall connecting piece connecting method and device
European Patent Office | 2021
|