Fabricated building prototype room construction method
The invention discloses a construction method for a fabricated building prototype room. The construction method comprises the steps of technical preparation, material preparation, constructor preparation, hoisting, cushion block placement, hoisting, in-place installation, whole fixing, hook taking, installation of other prefabricated parts and the like. According to the method, the construction method that a sample plate is arranged in advance is adopted, quality and safety are guaranteed in a construction site, loss of the template, square timber and the like is reduced in the aspect of material loss control, and therefore environmental pollution is reduced, noise is lowered, meanwhile, rework and quality defects are reduced, cost is saved, the construction period is shortened, and the construction period is shortened. And secondly, the construction technology of the fabricated structure is further optimized, the construction period is shortened, materials are saved, the environment is protected, energy is saved, emission is reduced, the fabricated construction quality is ensured, the fabricated building industry is guided to be better sustainable development, and the development of housing industrialization is accelerated and promoted.
本发明公开了装配式建筑样板间施工方法,包括,技术准备,物质准备,施工人员准备,吊装,放置垫块,吊运,就位安装,整固定,取钩,其他预制构件安装等步骤。本发明采用样板先行的施工做法,不仅在施工现场中做到了质量、安全方面的保证在材料损耗控制方面更是减少模板、方木等的损耗,从而减少了环境污染,降低了噪音,同时降低了返工和质量缺陷的产生,从而节约了成本,缩短了工期,提高工作效率,二进一步优化装配式结构施工工艺,缩短工期,节约材料,保护环境,节能减排,并确保装配式施工质量,引导装配式建筑业更好的可持续发展,加快推进住宅产业化的发展。
Fabricated building prototype room construction method
The invention discloses a construction method for a fabricated building prototype room. The construction method comprises the steps of technical preparation, material preparation, constructor preparation, hoisting, cushion block placement, hoisting, in-place installation, whole fixing, hook taking, installation of other prefabricated parts and the like. According to the method, the construction method that a sample plate is arranged in advance is adopted, quality and safety are guaranteed in a construction site, loss of the template, square timber and the like is reduced in the aspect of material loss control, and therefore environmental pollution is reduced, noise is lowered, meanwhile, rework and quality defects are reduced, cost is saved, the construction period is shortened, and the construction period is shortened. And secondly, the construction technology of the fabricated structure is further optimized, the construction period is shortened, materials are saved, the environment is protected, energy is saved, emission is reduced, the fabricated construction quality is ensured, the fabricated building industry is guided to be better sustainable development, and the development of housing industrialization is accelerated and promoted.
本发明公开了装配式建筑样板间施工方法,包括,技术准备,物质准备,施工人员准备,吊装,放置垫块,吊运,就位安装,整固定,取钩,其他预制构件安装等步骤。本发明采用样板先行的施工做法,不仅在施工现场中做到了质量、安全方面的保证在材料损耗控制方面更是减少模板、方木等的损耗,从而减少了环境污染,降低了噪音,同时降低了返工和质量缺陷的产生,从而节约了成本,缩短了工期,提高工作效率,二进一步优化装配式结构施工工艺,缩短工期,节约材料,保护环境,节能减排,并确保装配式施工质量,引导装配式建筑业更好的可持续发展,加快推进住宅产业化的发展。
Fabricated building prototype room construction method
装配式建筑样板间施工方法
LIU YONGPING (author) / GAO JUN (author) / XIE QISHENG (author) / XU YIJIAN (author) / GUI JIANHUA (author) / GUAN ZHIYONG (author) / PANG YONGJIE (author) / LI JIUMING (author) / ZHANG ZHIJUN (author) / TAO SHIQUAN (author)
2022-05-27
Patent
Electronic Resource
Chinese
BIM (Building Information Modeling) refrigerating room fabricated construction method
European Patent Office | 2024
|Fabricated building and fabricated building construction method
European Patent Office | 2023
|Fabricated building and fabricated building construction method
European Patent Office | 2024
|BIM-based high-speed railway station building machine room fabricated building construction method
European Patent Office | 2021
|Construction method of mobile electromechanical prototype room
European Patent Office | 2022
|