A platform for research: civil engineering, architecture and urbanism
Heavy haul railway subgrade settlement monitoring device
A heavy haul railway subgrade settlement monitoring device disclosed by the present invention comprises a settlement display mechanism, an energy-saving mechanism, an adjusting mechanism and a monitoring mechanism, the top end of the settlement display mechanism is provided with the energy-saving mechanism, the surface of the settlement display mechanism is provided with the adjusting mechanism, and the lower part of the inner side of the adjusting mechanism is provided with the monitoring mechanism. And the monitoring mechanism comprises a placement box, a transparent antifouling plate, an electric push rod, a limiting frame, a bearing rod, a limiting screw ring and a monitoring head. According to the heavy haul railway subgrade settlement monitoring device, the movable column is movably embedded in the fixed groove column, when the subgrade is settled, the fixed groove column and the bottom plate move downwards, the movable column does not move along with the movement of the fixed groove column, and railway personnel can judge and record the settlement of the subgrade according to the change of the scale marks on the surface of the movable column; the scale marks are arranged on the front and back of the surface of the movable column, so that railway personnel can directly record data through the monitoring head, manual field visual inspection recording is avoided, and the data collection efficiency is improved.
本发明公开了一种重载铁路路基沉降监测装置,包括沉降显示机构、节能机构、调节机构和监视机构,所述沉降显示机构的顶端设置有节能机构,且沉降显示机构的表面设置有调节机构,所述调节机构的内侧下方设置有监视机构,所述监视机构包括放置箱、透明防污板、电动推杆、限位架、承重杆、限位螺环和监控头。该重载铁路路基沉降监测装置,活动柱活动嵌合于固定槽柱内部,当路基发生沉降时,固定槽柱与底板向下移动,而活动柱不随着固定槽柱的移动而移动,铁路人员即可通过活动柱表面的刻度线变化对路基的沉降进行判断及记录,由于活动柱表面前后均设置有刻度线,铁路人员可通过监控头直接对数据进行记录,避免人工实地目测记录,提高数据收集效率。
Heavy haul railway subgrade settlement monitoring device
A heavy haul railway subgrade settlement monitoring device disclosed by the present invention comprises a settlement display mechanism, an energy-saving mechanism, an adjusting mechanism and a monitoring mechanism, the top end of the settlement display mechanism is provided with the energy-saving mechanism, the surface of the settlement display mechanism is provided with the adjusting mechanism, and the lower part of the inner side of the adjusting mechanism is provided with the monitoring mechanism. And the monitoring mechanism comprises a placement box, a transparent antifouling plate, an electric push rod, a limiting frame, a bearing rod, a limiting screw ring and a monitoring head. According to the heavy haul railway subgrade settlement monitoring device, the movable column is movably embedded in the fixed groove column, when the subgrade is settled, the fixed groove column and the bottom plate move downwards, the movable column does not move along with the movement of the fixed groove column, and railway personnel can judge and record the settlement of the subgrade according to the change of the scale marks on the surface of the movable column; the scale marks are arranged on the front and back of the surface of the movable column, so that railway personnel can directly record data through the monitoring head, manual field visual inspection recording is avoided, and the data collection efficiency is improved.
本发明公开了一种重载铁路路基沉降监测装置,包括沉降显示机构、节能机构、调节机构和监视机构,所述沉降显示机构的顶端设置有节能机构,且沉降显示机构的表面设置有调节机构,所述调节机构的内侧下方设置有监视机构,所述监视机构包括放置箱、透明防污板、电动推杆、限位架、承重杆、限位螺环和监控头。该重载铁路路基沉降监测装置,活动柱活动嵌合于固定槽柱内部,当路基发生沉降时,固定槽柱与底板向下移动,而活动柱不随着固定槽柱的移动而移动,铁路人员即可通过活动柱表面的刻度线变化对路基的沉降进行判断及记录,由于活动柱表面前后均设置有刻度线,铁路人员可通过监控头直接对数据进行记录,避免人工实地目测记录,提高数据收集效率。
Heavy haul railway subgrade settlement monitoring device
一种重载铁路路基沉降监测装置
ZHOU WENQUAN (author) / LIANG QIAO (author) / DUAN JIAN (author) / OUYANG XIANGSEN (author) / ZHANG JUAN (author)
2022-05-27
Patent
Electronic Resource
Chinese
IPC:
G01C
Messen von Entfernungen, Höhen, Neigungen oder Richtungen
,
MEASURING DISTANCES, LEVELS OR BEARINGS
/
E02D
FOUNDATIONS
,
Gründungen
/
F16M
Rahmen, Gehäuse oder Grundplatten von Kraftmaschinen oder anderen Maschinen oder von Apparaten, nicht auf eine besondere Art von Maschine oder Apparat eingeschränkt, die anderweitig vorgesehen ist
,
FRAMES, CASINGS, OR BEDS, OF ENGINES OR OTHER MACHINES OR APPARATUS, NOT SPECIFIC TO AN ENGINE, MACHINE, OR APPARATUS PROVIDED FOR ELSEWHERE
/
H04N
PICTORIAL COMMUNICATION, e.g. TELEVISION
,
Bildübertragung, z.B. Fernsehen
Surface layer-reinforced and waterproof heavy-axle load heavy-haul railway subgrade bed structure
European Patent Office | 2015
|Comparison and Analysis of Permafrost Railway Subgrade Settlement Deformation Monitoring
Tema Archive | 2012
|Comparison and Analysis of Permafrost Railway Subgrade Settlement Deformation Monitoring
Trans Tech Publications | 2012
|