A platform for research: civil engineering, architecture and urbanism
Stair interlayer stair section inclined plate reinforced by newly added channel steel and construction method of stair interlayer stair section inclined plate
The invention relates to a method for reinforcing an inclined plate of a stair interlayer bench by adopting newly-added channel steel and a construction method of the inclined plate. The inclined plate comprises the newly-added channel steel, newly-added end channel steel, anchor bolts and U-shaped connecting ribs, the newly-added channel steel is arranged on the two sides of the lower portion of the inclined plate of the original stair interlayer stair flight. A-type modified epoxy resin glue is used for bonding between the newly-added channel steel and the lower skin of the inclined plate of the interlayer stair flight of the original stair on the upper portion. The newly-added channel steel is connected with an original stair interlayer stair section inclined plate on the upper portion through anchor bolts; the newly-added end part channel steel is arranged at the end part of the original stair interlayer stair flight inclined plate, and the two ends of the newly-added end part channel steel are respectively welded with the newly-added channel steel; the U-shaped connecting rib is located between the newly-added channel steel and the vertical rib of the original platform beam frame, one end of the U-shaped connecting rib is welded to the newly-added channel steel, and the other end of the U-shaped connecting rib is welded to the vertical rib of the original platform beam frame. The method is simple in construction, safe and reliable, and uniform in structure stress.
本发明涉及一种楼梯层间梯段斜板采用新增槽钢加固及其施工方法,包括新增槽钢、新增端部槽钢、锚栓、U型连接筋;所述的新增槽钢设置在原楼梯层间梯段斜板下部的两侧;所述的新增槽钢与上部的原楼梯层间梯段斜板下皮之间粘结用A类改性环氧树脂胶;所述的新增槽钢与上部的原楼梯层间梯段斜板采用锚栓连接;所述的新增端部槽钢设置在原楼梯层间梯段斜板的端部,新增端部槽钢的两端分别与新增槽钢之间采用焊接;所述的U型连接筋位于新增槽钢和原平台梁架立筋之间,U型连接筋一端与新增槽钢焊接,另一端与原平台梁架立筋焊接。本发明施工简单、安全可靠,且结构受力均匀。
Stair interlayer stair section inclined plate reinforced by newly added channel steel and construction method of stair interlayer stair section inclined plate
The invention relates to a method for reinforcing an inclined plate of a stair interlayer bench by adopting newly-added channel steel and a construction method of the inclined plate. The inclined plate comprises the newly-added channel steel, newly-added end channel steel, anchor bolts and U-shaped connecting ribs, the newly-added channel steel is arranged on the two sides of the lower portion of the inclined plate of the original stair interlayer stair flight. A-type modified epoxy resin glue is used for bonding between the newly-added channel steel and the lower skin of the inclined plate of the interlayer stair flight of the original stair on the upper portion. The newly-added channel steel is connected with an original stair interlayer stair section inclined plate on the upper portion through anchor bolts; the newly-added end part channel steel is arranged at the end part of the original stair interlayer stair flight inclined plate, and the two ends of the newly-added end part channel steel are respectively welded with the newly-added channel steel; the U-shaped connecting rib is located between the newly-added channel steel and the vertical rib of the original platform beam frame, one end of the U-shaped connecting rib is welded to the newly-added channel steel, and the other end of the U-shaped connecting rib is welded to the vertical rib of the original platform beam frame. The method is simple in construction, safe and reliable, and uniform in structure stress.
本发明涉及一种楼梯层间梯段斜板采用新增槽钢加固及其施工方法,包括新增槽钢、新增端部槽钢、锚栓、U型连接筋;所述的新增槽钢设置在原楼梯层间梯段斜板下部的两侧;所述的新增槽钢与上部的原楼梯层间梯段斜板下皮之间粘结用A类改性环氧树脂胶;所述的新增槽钢与上部的原楼梯层间梯段斜板采用锚栓连接;所述的新增端部槽钢设置在原楼梯层间梯段斜板的端部,新增端部槽钢的两端分别与新增槽钢之间采用焊接;所述的U型连接筋位于新增槽钢和原平台梁架立筋之间,U型连接筋一端与新增槽钢焊接,另一端与原平台梁架立筋焊接。本发明施工简单、安全可靠,且结构受力均匀。
Stair interlayer stair section inclined plate reinforced by newly added channel steel and construction method of stair interlayer stair section inclined plate
楼梯层间梯段斜板采用新增槽钢加固及其施工方法
DONG YOU (author) / YANG NAYIN (author) / JU SHUSEN (author)
2022-05-31
Patent
Electronic Resource
Chinese
IPC:
E04G
SCAFFOLDING
,
Baugerüste
European Patent Office | 2022
|Manufacturing method of prefabricated stair section and prefabricated stair section
European Patent Office | 2021
|Stair, stair group and method for manufacturing stair group
European Patent Office | 2024
|