A platform for research: civil engineering, architecture and urbanism
The invention belongs to the technical field of water channel construction, and particularly relates to a water conservancy project construction diversion drainage structure and a construction method thereof. The water retaining dam is arranged on the inner wall of the main water channel, and the water retaining dam is used for flood prevention and flow regulation; the straight gate is fixedly connected to the side, close to the downstream of the main water channel, of the retaining dam; the straight gate and the flow guide gate are arranged at the downstream position of the retaining dam at the same time, water flow can directly flow from the straight gate to the downstream position, and when flow guide needs to be conducted to relieve downstream pressure in the flood season, part of the water flow is guided to other positions through the flow guide gate, so that the flow guide structure is more reasonable; the arranged energy supply assembly can achieve a certain potential energy utilization effect at the flow guide position, the arranged blocking assembly can also filter impurities such as floating garbage in water flow, and the arranged energy supply assembly and the arranged blocking assembly can also achieve a certain water flow buffering effect.
本发明公开的属于水道施工技术领域,具体为一种水利工程施工导流排水结构及其施工方法,包括主水道;拦水坝,所述拦水坝设置在所述主水道的内壁,所述拦水坝用于防汛和调节流量;直闸口,所述直闸口固定连接在所述拦水坝靠近所述主水道下游的一侧;通过在拦水坝的下游位置同时设置直闸口和导流闸口,水流可以从直闸口向下游直接流动,在汛期需要进行导流缓解下游压力的时候,将部分水流通过导流闸口导向其他位置,使得导流的结构更加合理,设置的供能组件可以在导流位置起到一定的势能利用的效果,设置的拦挡组件也可以对水流中的漂浮垃圾等杂质进行过滤,设置的供能组件和拦挡组件也可以起到一定的对水流缓冲的效果。
The invention belongs to the technical field of water channel construction, and particularly relates to a water conservancy project construction diversion drainage structure and a construction method thereof. The water retaining dam is arranged on the inner wall of the main water channel, and the water retaining dam is used for flood prevention and flow regulation; the straight gate is fixedly connected to the side, close to the downstream of the main water channel, of the retaining dam; the straight gate and the flow guide gate are arranged at the downstream position of the retaining dam at the same time, water flow can directly flow from the straight gate to the downstream position, and when flow guide needs to be conducted to relieve downstream pressure in the flood season, part of the water flow is guided to other positions through the flow guide gate, so that the flow guide structure is more reasonable; the arranged energy supply assembly can achieve a certain potential energy utilization effect at the flow guide position, the arranged blocking assembly can also filter impurities such as floating garbage in water flow, and the arranged energy supply assembly and the arranged blocking assembly can also achieve a certain water flow buffering effect.
本发明公开的属于水道施工技术领域,具体为一种水利工程施工导流排水结构及其施工方法,包括主水道;拦水坝,所述拦水坝设置在所述主水道的内壁,所述拦水坝用于防汛和调节流量;直闸口,所述直闸口固定连接在所述拦水坝靠近所述主水道下游的一侧;通过在拦水坝的下游位置同时设置直闸口和导流闸口,水流可以从直闸口向下游直接流动,在汛期需要进行导流缓解下游压力的时候,将部分水流通过导流闸口导向其他位置,使得导流的结构更加合理,设置的供能组件可以在导流位置起到一定的势能利用的效果,设置的拦挡组件也可以对水流中的漂浮垃圾等杂质进行过滤,设置的供能组件和拦挡组件也可以起到一定的对水流缓冲的效果。
Water conservancy project construction diversion drainage structure and construction method thereof
一种水利工程施工导流排水结构及其施工方法
ZHU RUI (author)
2022-06-03
Patent
Electronic Resource
Chinese
Water conservancy project construction diversion drainage structure
European Patent Office | 2023
|Water conservancy project construction diversion drainage structure and construction method thereof
European Patent Office | 2022
|European Patent Office | 2015
|Water conservancy project drainage structure and construction method thereof
European Patent Office | 2024
|Water conservancy project diversion tunnel blocking construction method
European Patent Office | 2024
|