A platform for research: civil engineering, architecture and urbanism
Ecological reconstruction method for urban upright retaining wall revetment
The invention relates to the technical field of retaining wall reconstruction, in particular to an ecological reconstruction method for an urban upright retaining wall revetment. The method comprises the following steps: S1, forming a planting area; s1-1, a horizontal bottom plate is formed on one side of the upstream face of the retaining wall in a pouring mode, and the bottom plate is arranged in the length direction of the retaining wall; s1-2, a side wall is formed on the upper surface of the bottom plate in a mortar building and stone stacking mode, and a planting groove is formed by the side wall, the bottom plate and the upstream face of the retaining wall. S2, planting soil is spread, wherein the planting soil is spread in the planting grooves to form a planting soil layer. S3, planting plants, namely planting green plants on the planting soil layer. The urban river bank retaining wall has the effect of improving the ecological greening level of the urban river bank retaining wall.
本申请涉及挡墙改造的技术领域,尤其是涉及一种城市直立挡墙护岸的生态改造方法。其包括以下步骤,S1,形成栽种区域;S1‑1,在挡墙迎水面一侧浇筑形成水平的底板,所述底板沿挡墙长度方向设置;S1‑2,在底板上表面通过浆砌叠石的方式形成侧墙,侧墙与底板以及挡墙的迎水面形成种植槽。S2,摊铺种植土,在种植槽内摊铺种植土形成种植土层。S3,栽种植物,在种植土层上栽种绿植。本申请具有提高城市河岸挡墙的生态绿化水平的效果。
Ecological reconstruction method for urban upright retaining wall revetment
The invention relates to the technical field of retaining wall reconstruction, in particular to an ecological reconstruction method for an urban upright retaining wall revetment. The method comprises the following steps: S1, forming a planting area; s1-1, a horizontal bottom plate is formed on one side of the upstream face of the retaining wall in a pouring mode, and the bottom plate is arranged in the length direction of the retaining wall; s1-2, a side wall is formed on the upper surface of the bottom plate in a mortar building and stone stacking mode, and a planting groove is formed by the side wall, the bottom plate and the upstream face of the retaining wall. S2, planting soil is spread, wherein the planting soil is spread in the planting grooves to form a planting soil layer. S3, planting plants, namely planting green plants on the planting soil layer. The urban river bank retaining wall has the effect of improving the ecological greening level of the urban river bank retaining wall.
本申请涉及挡墙改造的技术领域,尤其是涉及一种城市直立挡墙护岸的生态改造方法。其包括以下步骤,S1,形成栽种区域;S1‑1,在挡墙迎水面一侧浇筑形成水平的底板,所述底板沿挡墙长度方向设置;S1‑2,在底板上表面通过浆砌叠石的方式形成侧墙,侧墙与底板以及挡墙的迎水面形成种植槽。S2,摊铺种植土,在种植槽内摊铺种植土形成种植土层。S3,栽种植物,在种植土层上栽种绿植。本申请具有提高城市河岸挡墙的生态绿化水平的效果。
Ecological reconstruction method for urban upright retaining wall revetment
一种城市直立挡墙护岸的生态改造方法
WU WENHUA (author) / HUANG HAIZHEN (author) / HUANG KAIWEN (author) / WENG ZHAN (author) / LIU YONGLIN (author) / SU GUANNAN (author) / REN KEYI (author) / LAN LIWEI (author) / LIANG QINGYU (author) / ZHU KUN (author)
2022-06-03
Patent
Electronic Resource
Chinese
Ecological retaining wall revetment for river protection
European Patent Office | 2023
|Green ecological retaining wall revetment based on 3D printing concrete
European Patent Office | 2024
|Revetment retaining wall and construction method thereof
European Patent Office | 2024
|European Patent Office | 2023