A platform for research: civil engineering, architecture and urbanism
Green and environment-friendly fabricated building prefabricated wall mounting device and construction method
The invention discloses a green and environment-friendly prefabricated building prefabricated wall mounting device and construction method.The green and environment-friendly prefabricated building prefabricated wall mounting device comprises a fixed base, a first prefabricated wall, a fixed seat, a sliding mechanism, a positioning mechanism and a moving mechanism, a slurry sealing sponge strip is arranged on one side of the top end of the fixed base, and the first prefabricated wall is arranged at the top end of the fixed base; the front face of the first prefabricated wall body is fixedly connected with the second prefabricated wall body, the fixing base is fixedly installed at the top end of the fixing base, the sliding mechanism is arranged in the fixing base, the positioning mechanism is arranged outside the fixing base, and the moving mechanism is arranged on one side of the fixing base. The sliding mechanism is matched with the straight-line-shaped code on the outer wall, accurate butt joint of the positioning steel bar and the positioning hole is facilitated, the butt joint method that a worker holds a mirror to observe is replaced, and the phenomenon that when the first prefabricated wall body and the second prefabricated wall body shake in a large-radian mode, the worker is injured to a certain degree is avoided.
本发明公开了一种绿色环保型装配式建筑预制墙体安装装置及施工方法,包括固定底座、第一预制墙体、固定座、滑动机构、定位机构和移动机构,固定底座顶端的一侧设置有封浆海绵条,第一预制墙体设置于固定底座的顶端,第一预制墙体的正面固定连接有第二预制墙体,固定座固定安装于固定底座的顶端,滑动机构设置于固定座的内部,定位机构设置于固定座的外部,移动机构设置于固定座的一侧,本发明的有益效果是:本发明利用滑动机构的设计,通过滑动机构与外墙上的一字码相互配合,方便定位钢筋与定位孔的准确对接,替换掉了工人手持镜子观察的对接方法,避免了第一预制墙体与第二预制墙体出现大弧度晃动时对工人造成一定伤害的现象发生。
Green and environment-friendly fabricated building prefabricated wall mounting device and construction method
The invention discloses a green and environment-friendly prefabricated building prefabricated wall mounting device and construction method.The green and environment-friendly prefabricated building prefabricated wall mounting device comprises a fixed base, a first prefabricated wall, a fixed seat, a sliding mechanism, a positioning mechanism and a moving mechanism, a slurry sealing sponge strip is arranged on one side of the top end of the fixed base, and the first prefabricated wall is arranged at the top end of the fixed base; the front face of the first prefabricated wall body is fixedly connected with the second prefabricated wall body, the fixing base is fixedly installed at the top end of the fixing base, the sliding mechanism is arranged in the fixing base, the positioning mechanism is arranged outside the fixing base, and the moving mechanism is arranged on one side of the fixing base. The sliding mechanism is matched with the straight-line-shaped code on the outer wall, accurate butt joint of the positioning steel bar and the positioning hole is facilitated, the butt joint method that a worker holds a mirror to observe is replaced, and the phenomenon that when the first prefabricated wall body and the second prefabricated wall body shake in a large-radian mode, the worker is injured to a certain degree is avoided.
本发明公开了一种绿色环保型装配式建筑预制墙体安装装置及施工方法,包括固定底座、第一预制墙体、固定座、滑动机构、定位机构和移动机构,固定底座顶端的一侧设置有封浆海绵条,第一预制墙体设置于固定底座的顶端,第一预制墙体的正面固定连接有第二预制墙体,固定座固定安装于固定底座的顶端,滑动机构设置于固定座的内部,定位机构设置于固定座的外部,移动机构设置于固定座的一侧,本发明的有益效果是:本发明利用滑动机构的设计,通过滑动机构与外墙上的一字码相互配合,方便定位钢筋与定位孔的准确对接,替换掉了工人手持镜子观察的对接方法,避免了第一预制墙体与第二预制墙体出现大弧度晃动时对工人造成一定伤害的现象发生。
Green and environment-friendly fabricated building prefabricated wall mounting device and construction method
一种绿色环保型装配式建筑预制墙体安装装置及施工方法
TANG BOYU (author) / ZHAO JINLONG (author)
2022-06-03
Patent
Electronic Resource
Chinese
Outer wall prefabricated slab mounting device of fabricated building
European Patent Office | 2022
|European Patent Office | 2023
|Environment-friendly energy-saving fabricated building wall and mounting method
European Patent Office | 2024
|European Patent Office | 2023
|