Rapid asphalt melting system for highway engineering
The invention discloses a highway engineering asphalt rapid melting system in the technical field of asphalt rapid melting. The highway engineering asphalt rapid melting system comprises a U-shaped mounting plate, and a plurality of conveying rollers are rotationally connected to the inner wall of the mounting plate; asphalt is cut into blocks with similar sizes, so that the sizes of the asphalt blocks fed into the heating bin are similar, the melting conditions of the asphalt heated for the same time are the same, and the situation that small asphalt is aged after being heated for a long time and large asphalt is not completely melted due to the fact that the sizes of the fed asphalt are different is avoided. The normal use of the asphalt is influenced; the asphalt is heated and melted separately, so that the asphalt can be fully heated and melted, and when the asphalt is continuously fed, the asphalt can be fully heated and melted, and the situation that all the asphalt is heated together, newly fed asphalt cannot be fully heated and melted, so that the asphalt is heated unevenly, and the asphalt cannot be fully heated and melted is avoided. The normal use of the asphalt is influenced.
本发明公开了沥青快速融化技术领域的一种公路工程沥青快速融化系统,包括U形的安装板,所述安装板内壁转动连接有多个输送辊;本发明通过将沥青分切成大小相似的块状,有利于使投入到加热仓内的沥青块大小相似,保证加热相同时间的沥青融化情况相同,避免投入的沥青大小不同,导致较小的沥青加热时间较长会老化,而较大块的沥青还未完全融化,影响沥青的正常使用;并且将沥青进行分隔加热融化有利于使沥青能够被充分的被加热融化,并且在持续的投入沥青时,沥青也能充分的被加热融化,避免将所有的沥青一起进行加热,新投入的沥青不能充分的受热融化,从而导致沥青受热不均,影响沥青的正常使用。
Rapid asphalt melting system for highway engineering
The invention discloses a highway engineering asphalt rapid melting system in the technical field of asphalt rapid melting. The highway engineering asphalt rapid melting system comprises a U-shaped mounting plate, and a plurality of conveying rollers are rotationally connected to the inner wall of the mounting plate; asphalt is cut into blocks with similar sizes, so that the sizes of the asphalt blocks fed into the heating bin are similar, the melting conditions of the asphalt heated for the same time are the same, and the situation that small asphalt is aged after being heated for a long time and large asphalt is not completely melted due to the fact that the sizes of the fed asphalt are different is avoided. The normal use of the asphalt is influenced; the asphalt is heated and melted separately, so that the asphalt can be fully heated and melted, and when the asphalt is continuously fed, the asphalt can be fully heated and melted, and the situation that all the asphalt is heated together, newly fed asphalt cannot be fully heated and melted, so that the asphalt is heated unevenly, and the asphalt cannot be fully heated and melted is avoided. The normal use of the asphalt is influenced.
本发明公开了沥青快速融化技术领域的一种公路工程沥青快速融化系统,包括U形的安装板,所述安装板内壁转动连接有多个输送辊;本发明通过将沥青分切成大小相似的块状,有利于使投入到加热仓内的沥青块大小相似,保证加热相同时间的沥青融化情况相同,避免投入的沥青大小不同,导致较小的沥青加热时间较长会老化,而较大块的沥青还未完全融化,影响沥青的正常使用;并且将沥青进行分隔加热融化有利于使沥青能够被充分的被加热融化,并且在持续的投入沥青时,沥青也能充分的被加热融化,避免将所有的沥青一起进行加热,新投入的沥青不能充分的受热融化,从而导致沥青受热不均,影响沥青的正常使用。
Rapid asphalt melting system for highway engineering
一种公路工程沥青快速融化系统
LUO XIULAN (author) / TA BAOKUAN (author) / MA JUN (author)
2022-06-10
Patent
Electronic Resource
Chinese
IPC:
E01C
Bau von Straßen, Sportplätzen oder dgl., Decken dafür
,
CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE