A platform for research: civil engineering, architecture and urbanism
Rapid pile pulling device for civil engineering
The invention discloses a rapid pile pulling device for civil engineering, and relates to the technical field of pile pulling devices, the rapid pile pulling device for civil engineering comprises a main mounting base plate, two main moving grooves are formed in the main mounting base plate, inner moving blocks are slidably connected into the two main moving grooves, and electromagnets are fixedly mounted on one sides of the interiors of the main moving grooves; and a first spring is fixedly mounted in the main moving groove and located on the side away from the electromagnet, the first spring is fixedly connected with an inner moving block, an upper pile pulling column is fixedly mounted at the top of the inner moving block, and a first inner mounting groove is formed in one side of the interior of the main mounting base plate. According to the automatic pile pulling equipment, the pile pulling work is carried out in a mechanical force pile pulling mode when the automatic pile pulling equipment is used, so that the investment of human resources is further reduced, meanwhile, the pile pulling efficiency can be further improved, and compared with a currently-used manual pile pulling mode, the automatic pile pulling equipment is more convenient to use.
本发明公开了一种土木工程用快速拔桩装置,涉及拔桩装置技术领域,包括主安装基板,主安装基板的内部开设有两个主移动槽,两个主移动槽的内部均滑动连接有内移动块,主移动槽内部的一侧固定安装有电磁铁,主移动槽内部且位于远离电磁铁的一侧固定安装有第一弹簧,第一弹簧与内移动块固定连接,内移动块的顶部固定安装有上拔桩柱,主安装基板内部的一侧开设有第一内安装槽,本发明的有益效果为:该土木工程用快速拔桩装置,通过使用自动化的拔桩设备,在使用的时候通过使用机械力拔桩的方式进行拔桩工作,从而进一步的降低人力资源的投入,同时也可以进一步的提高拔桩的效率,相比于目前使用的人工拔桩方式而言,使用更加方便。
Rapid pile pulling device for civil engineering
The invention discloses a rapid pile pulling device for civil engineering, and relates to the technical field of pile pulling devices, the rapid pile pulling device for civil engineering comprises a main mounting base plate, two main moving grooves are formed in the main mounting base plate, inner moving blocks are slidably connected into the two main moving grooves, and electromagnets are fixedly mounted on one sides of the interiors of the main moving grooves; and a first spring is fixedly mounted in the main moving groove and located on the side away from the electromagnet, the first spring is fixedly connected with an inner moving block, an upper pile pulling column is fixedly mounted at the top of the inner moving block, and a first inner mounting groove is formed in one side of the interior of the main mounting base plate. According to the automatic pile pulling equipment, the pile pulling work is carried out in a mechanical force pile pulling mode when the automatic pile pulling equipment is used, so that the investment of human resources is further reduced, meanwhile, the pile pulling efficiency can be further improved, and compared with a currently-used manual pile pulling mode, the automatic pile pulling equipment is more convenient to use.
本发明公开了一种土木工程用快速拔桩装置,涉及拔桩装置技术领域,包括主安装基板,主安装基板的内部开设有两个主移动槽,两个主移动槽的内部均滑动连接有内移动块,主移动槽内部的一侧固定安装有电磁铁,主移动槽内部且位于远离电磁铁的一侧固定安装有第一弹簧,第一弹簧与内移动块固定连接,内移动块的顶部固定安装有上拔桩柱,主安装基板内部的一侧开设有第一内安装槽,本发明的有益效果为:该土木工程用快速拔桩装置,通过使用自动化的拔桩设备,在使用的时候通过使用机械力拔桩的方式进行拔桩工作,从而进一步的降低人力资源的投入,同时也可以进一步的提高拔桩的效率,相比于目前使用的人工拔桩方式而言,使用更加方便。
Rapid pile pulling device for civil engineering
一种土木工程用快速拔桩装置
DAI XIAOQING (author) / LU HENG (author)
2022-06-10
Patent
Electronic Resource
Chinese
IPC:
E02D
FOUNDATIONS
,
Gründungen
Small-diameter rapid pile pulling device for civil engineering
European Patent Office | 2023
|Small-diameter rapid pile pulling equipment for civil engineering
European Patent Office | 2022
|Rapid pile pulling device for civil engineering and using method thereof
European Patent Office | 2022
|