A platform for research: civil engineering, architecture and urbanism
The prefabricated thermal insulation wall comprises a thermal insulation wall body and an external butt joint frame, the external butt joint frame is fixed to the outer side of the thermal insulation wall body and used for splicing the thermal insulation wall body, and an outer side heat absorption plate is arranged on the left side of the thermal insulation wall body and used for absorbing external heat; a first air pressure cavity is formed in the right side of the outer side heat absorption plate, a first heat transfer plate is arranged on the right side of the first air pressure cavity, an inner side heat dissipation plate is arranged on the right side of the heat preservation wall body, a second air pressure cavity is formed in the left side of the inner side heat dissipation plate, and a second heat transfer plate is arranged on the left side of the second air pressure cavity. The prefabricated heat preservation wall is provided with the first air pressure cavity and the second air pressure cavity, internal and external environment temperature changes can be compared through air pressure changes in the first air pressure cavity and the second air pressure cavity, heat conduction from outside to inside can be achieved through follow-up cooperation with connection of the first heat transfer plate and the heat conduction plate, and a better heat preservation effect can be provided in winter; the functionality is improved.
本发明公开了一种预制装配式保温墙体,包括保温墙主体和外部对接框,所述外部对接框固定在保温墙主体的外侧用于保温墙主体的拼接,所述保温墙主体的左侧设置有外侧吸热板,用于吸收外部热量,且外侧吸热板的右侧设置有第一气压腔,并且第一气压腔的右侧设置有第一传热板,所述保温墙主体的右侧设置有内侧散热板,且内侧散热板的左侧设置有第二气压腔,并且第二气压腔的左侧设置有第二传热板。该预制装配式保温墙体设置有第一气压腔和第二气压腔,通过第一气压腔和第二气压腔内的气体压力变化可对比内外环境温度变化,后续配合第一传热板和导热板的连接可实现热量由外向内的传导,在冬季能提供更好的保温效果,增加其功能性。
The prefabricated thermal insulation wall comprises a thermal insulation wall body and an external butt joint frame, the external butt joint frame is fixed to the outer side of the thermal insulation wall body and used for splicing the thermal insulation wall body, and an outer side heat absorption plate is arranged on the left side of the thermal insulation wall body and used for absorbing external heat; a first air pressure cavity is formed in the right side of the outer side heat absorption plate, a first heat transfer plate is arranged on the right side of the first air pressure cavity, an inner side heat dissipation plate is arranged on the right side of the heat preservation wall body, a second air pressure cavity is formed in the left side of the inner side heat dissipation plate, and a second heat transfer plate is arranged on the left side of the second air pressure cavity. The prefabricated heat preservation wall is provided with the first air pressure cavity and the second air pressure cavity, internal and external environment temperature changes can be compared through air pressure changes in the first air pressure cavity and the second air pressure cavity, heat conduction from outside to inside can be achieved through follow-up cooperation with connection of the first heat transfer plate and the heat conduction plate, and a better heat preservation effect can be provided in winter; the functionality is improved.
本发明公开了一种预制装配式保温墙体,包括保温墙主体和外部对接框,所述外部对接框固定在保温墙主体的外侧用于保温墙主体的拼接,所述保温墙主体的左侧设置有外侧吸热板,用于吸收外部热量,且外侧吸热板的右侧设置有第一气压腔,并且第一气压腔的右侧设置有第一传热板,所述保温墙主体的右侧设置有内侧散热板,且内侧散热板的左侧设置有第二气压腔,并且第二气压腔的左侧设置有第二传热板。该预制装配式保温墙体设置有第一气压腔和第二气压腔,通过第一气压腔和第二气压腔内的气体压力变化可对比内外环境温度变化,后续配合第一传热板和导热板的连接可实现热量由外向内的传导,在冬季能提供更好的保温效果,增加其功能性。
Prefabricated thermal insulation wall
一种预制装配式保温墙体
ZHOU PINGBO (author)
2022-06-10
Patent
Electronic Resource
Chinese
European Patent Office | 2020
|Prefabricated sandwich thermal insulation wall for prefabricated building
European Patent Office | 2021
|