A platform for research: civil engineering, architecture and urbanism
Water conservancy pipeline pre-burying device and construction method thereof
The invention discloses a water conservancy pipeline pre-burying device and a construction method thereof, and relates to the technical field of water conservancy pipeline pre-burying devices, in particular to a water conservancy pipeline pre-burying device and a construction method thereof. The limiting clamping piece comprises a main buckle piece, a first auxiliary buckle piece and a second auxiliary buckle piece, the inner side of the main buckle piece is movably connected with a main protection piece, and the top of the main protection piece is movably connected with a main pipe connecting piece. According to the water conservancy pipeline pre-burying device and the construction method thereof, the limiting clamping piece, the protection assembly and the external pipe fitting are arranged, and effective supporting and stable protection are provided for the three structures under the protection assembly and the external pipe fitting through the main buckling piece, the first auxiliary buckling piece and the second auxiliary buckling piece; and it can be guaranteed that the device can be effectively fixed to regions with different soil properties.
本发明公开了一种水利管道预埋装置及其施工方法,涉及水利管道预埋装置技术领域,具体为一种水利管道预埋装置及其施工方法,包括限位卡件,所述限位卡件下辖设置有三个部件,且限位卡件下辖三处部件分别有主扣件、第一副扣件、第二副扣件,所述主扣件的内侧活动连接有主护件,所述主护件的顶部活动连接主管接件。该水利管道预埋装置及其施工方法,通过设置限位卡件和防护组件以及外接管件三种结构,且利用主扣件、第一副扣件、第二副扣件为防护组件和外接管件下辖的三种结构提供有效的支撑和稳定防护,能够保证了该装置可以有效固定在不同土质的地域。
Water conservancy pipeline pre-burying device and construction method thereof
The invention discloses a water conservancy pipeline pre-burying device and a construction method thereof, and relates to the technical field of water conservancy pipeline pre-burying devices, in particular to a water conservancy pipeline pre-burying device and a construction method thereof. The limiting clamping piece comprises a main buckle piece, a first auxiliary buckle piece and a second auxiliary buckle piece, the inner side of the main buckle piece is movably connected with a main protection piece, and the top of the main protection piece is movably connected with a main pipe connecting piece. According to the water conservancy pipeline pre-burying device and the construction method thereof, the limiting clamping piece, the protection assembly and the external pipe fitting are arranged, and effective supporting and stable protection are provided for the three structures under the protection assembly and the external pipe fitting through the main buckling piece, the first auxiliary buckling piece and the second auxiliary buckling piece; and it can be guaranteed that the device can be effectively fixed to regions with different soil properties.
本发明公开了一种水利管道预埋装置及其施工方法,涉及水利管道预埋装置技术领域,具体为一种水利管道预埋装置及其施工方法,包括限位卡件,所述限位卡件下辖设置有三个部件,且限位卡件下辖三处部件分别有主扣件、第一副扣件、第二副扣件,所述主扣件的内侧活动连接有主护件,所述主护件的顶部活动连接主管接件。该水利管道预埋装置及其施工方法,通过设置限位卡件和防护组件以及外接管件三种结构,且利用主扣件、第一副扣件、第二副扣件为防护组件和外接管件下辖的三种结构提供有效的支撑和稳定防护,能够保证了该装置可以有效固定在不同土质的地域。
Water conservancy pipeline pre-burying device and construction method thereof
一种水利管道预埋装置及其施工方法
2022-06-14
Patent
Electronic Resource
Chinese
Water conservancy pipeline pre-burying device and construction method thereof
European Patent Office | 2021
|Pipeline burying construction equipment for irrigation and water conservancy
European Patent Office | 2024
|European Patent Office | 2023
|European Patent Office | 2023
|