A platform for research: civil engineering, architecture and urbanism
Arch bridge vault stone substitute formwork construction method
The invention relates to an arch bridge vault stone substitute formwork construction method. The method comprises the following steps that (1) a full framing is built; 2) constructing a bottom die at the top end of the bracket; (3) a protective layer is laid on the bottom die; 4) paving stones on the protective layer; (5) steel bars are laid on the stone, and then pouring of vault concrete is completed; according to the method, customized stone can be used as an arch ring outer mold, concrete pouring of an arch bridge body and installation of the stone are integrally formed, the landscape effect is reserved, the construction period is shortened, the bridge manufacturing cost is reduced, and the market requirement is fully met.
本发明涉及一种拱桥拱顶石代模施工方法,包括以下步骤:1)搭建满堂支架;2)在支架顶端构建底模;3)在底模上铺设保护层;4)在保护层上铺设石材;5)在石材上敷设钢筋,然后,完成拱顶混凝土的浇筑;6)拆除满堂支架、底模和保护层;7)完成拱顶砼及石材的装饰。本发明可以利用定制石材做拱圈外模,将拱桥主体砼浇筑与石材的安装一体成型,既保留了景观效果,又减少了工期,降低了桥梁造价,充分满足了市场需求。
Arch bridge vault stone substitute formwork construction method
The invention relates to an arch bridge vault stone substitute formwork construction method. The method comprises the following steps that (1) a full framing is built; 2) constructing a bottom die at the top end of the bracket; (3) a protective layer is laid on the bottom die; 4) paving stones on the protective layer; (5) steel bars are laid on the stone, and then pouring of vault concrete is completed; according to the method, customized stone can be used as an arch ring outer mold, concrete pouring of an arch bridge body and installation of the stone are integrally formed, the landscape effect is reserved, the construction period is shortened, the bridge manufacturing cost is reduced, and the market requirement is fully met.
本发明涉及一种拱桥拱顶石代模施工方法,包括以下步骤:1)搭建满堂支架;2)在支架顶端构建底模;3)在底模上铺设保护层;4)在保护层上铺设石材;5)在石材上敷设钢筋,然后,完成拱顶混凝土的浇筑;6)拆除满堂支架、底模和保护层;7)完成拱顶砼及石材的装饰。本发明可以利用定制石材做拱圈外模,将拱桥主体砼浇筑与石材的安装一体成型,既保留了景观效果,又减少了工期,降低了桥梁造价,充分满足了市场需求。
Arch bridge vault stone substitute formwork construction method
一种拱桥拱顶石代模施工方法
XU XIN (author) / JIANG CHEN (author) / MA JUAN (author) / LIANG ZHIJIAN (author) / WANG HAI (author) / XU HAI (author) / TANG BIN (author) / ZHANG YING (author)
2022-06-17
Patent
Electronic Resource
Chinese
IPC:
E01D
BRIDGES
,
Brücken
Arched support, arch bridge formwork and arch bridge formwork construction method
European Patent Office | 2023
|Arch bridge encased concrete top plate formwork construction method and top plate formwork thereof
European Patent Office | 2023
|Formwork system and method for arch bridge construction in alpine region
European Patent Office | 2023
|"Wurm" Pipe Bridge with Inner Vault Formwork and Curing Car
British Library Online Contents | 2003
|