A platform for research: civil engineering, architecture and urbanism
Prefabricated bathroom
The invention provides a prefabricated bathroom, and relates to the technical field of buildings. The prefabricated bathroom comprises a bottom plate and at least one wall plate. The lower end of the wall plate is connected to the bottom plate, the wall plate is formed by pouring ultra-high performance concrete, the wall plate is provided with a hollow part, the hollow part is located between the two plate faces of the wall plate, and a pipeline can be installed in the hollow part. The wallboard is provided with the hollow part, so that the water and electricity pipelines can be pre-buried, the damage to the structural strength of the prefabricated bathroom and the influence on the impermeability of the prefabricated bathroom caused by digging the wallboard can be avoided, the weight of the prefabricated bathroom can be reduced, the prefabricated bathroom is convenient to hoist, consumables are saved, and the cost is saved. The wallboard is formed by pouring ultra-high-performance concrete, so that the overall strength, rigidity and stability of the structure are guaranteed, and excellent waterproof and weather-resistant performance is also provided.
本申请提供了一种预制卫浴,涉及建筑技术领域。预制卫浴包括底板和至少一个墙板。墙板的下端连接于所述底板,墙板采用超高性能混凝土浇筑成型,墙板具有中空部,中空部位于墙板的两个板面之间,中空部能够安装管线。墙板设有中空部,不仅能够预埋水电管线,避免对墙板开凿破坏预制卫浴的结构强度和影响防渗透性能,还能减轻预制卫浴的重量,便于预制卫浴吊装,节省耗材,节约成本。墙板采用超高性能混凝土浇筑成型,既保证了结构的整体强度、刚度、稳定性,也提供了绝佳的防水耐候性能。
Prefabricated bathroom
The invention provides a prefabricated bathroom, and relates to the technical field of buildings. The prefabricated bathroom comprises a bottom plate and at least one wall plate. The lower end of the wall plate is connected to the bottom plate, the wall plate is formed by pouring ultra-high performance concrete, the wall plate is provided with a hollow part, the hollow part is located between the two plate faces of the wall plate, and a pipeline can be installed in the hollow part. The wallboard is provided with the hollow part, so that the water and electricity pipelines can be pre-buried, the damage to the structural strength of the prefabricated bathroom and the influence on the impermeability of the prefabricated bathroom caused by digging the wallboard can be avoided, the weight of the prefabricated bathroom can be reduced, the prefabricated bathroom is convenient to hoist, consumables are saved, and the cost is saved. The wallboard is formed by pouring ultra-high-performance concrete, so that the overall strength, rigidity and stability of the structure are guaranteed, and excellent waterproof and weather-resistant performance is also provided.
本申请提供了一种预制卫浴,涉及建筑技术领域。预制卫浴包括底板和至少一个墙板。墙板的下端连接于所述底板,墙板采用超高性能混凝土浇筑成型,墙板具有中空部,中空部位于墙板的两个板面之间,中空部能够安装管线。墙板设有中空部,不仅能够预埋水电管线,避免对墙板开凿破坏预制卫浴的结构强度和影响防渗透性能,还能减轻预制卫浴的重量,便于预制卫浴吊装,节省耗材,节约成本。墙板采用超高性能混凝土浇筑成型,既保证了结构的整体强度、刚度、稳定性,也提供了绝佳的防水耐候性能。