Remaining soil treatment method for temporary road construction disturbance in power transmission and transformation project hilly region
The invention discloses a residual soil disposal method for temporary road construction disturbance in a power transmission and transformation project hilly area, and belongs to the technical field of earth-rock construction. The method comprises the steps that terrain parameters within a preset range with a tower footing as the center are obtained; determining a construction line according to the terrain parameters; determining a residual soil in-situ disposal construction area and a residual soil ectopic disposal construction area according to the slope value of the construction area in the terrain parameters; during construction, surface soil in a construction area is stripped and stacked at a specific place; when construction is conducted to the remaining soil in-situ disposal construction area, the remaining soil is backfilled to the remaining soil in-situ disposal construction area; when construction is conducted to the residual soil displacement treatment construction area, the residual soil is backfilled to a specific structure backfilling area; and covering the stripped surface soil. According to the technical scheme, the condition of water and soil loss caused by unfavorable disposal of the residual soil in temporary road construction is avoided, and earth-rock balance in the temporary road construction range is realized by adopting a mode of combining in-situ disposal and ectopic disposal of the residual soil.
本发明公开了一种输变电工程山丘区临时道路施工扰动的余土处置方法,属于土石方施工技术领域,包括:获取以塔基为中心的预设范围内的地形参数;依据所述地形参数确定施工线路;根据所述地形参数中的施工区域的坡度值确定余土原位处置施工区域和余土异位处置施工区域;施工时将施工区表土剥离并堆放在特定地点;施工至余土原位处置施工区域时,将余土回填至所述余土原位处置施工区域;施工至余土异位处置施工区域时,将余土回填至特定结构回填区;将剥离的表土回覆。本发明技术方案避免了临时道路施工余土处置不利导致的水土流失状况,通过采用余土原位处置、异位处置相结合的方式,实现临时道路施工范围内的土石方平衡。
Remaining soil treatment method for temporary road construction disturbance in power transmission and transformation project hilly region
The invention discloses a residual soil disposal method for temporary road construction disturbance in a power transmission and transformation project hilly area, and belongs to the technical field of earth-rock construction. The method comprises the steps that terrain parameters within a preset range with a tower footing as the center are obtained; determining a construction line according to the terrain parameters; determining a residual soil in-situ disposal construction area and a residual soil ectopic disposal construction area according to the slope value of the construction area in the terrain parameters; during construction, surface soil in a construction area is stripped and stacked at a specific place; when construction is conducted to the remaining soil in-situ disposal construction area, the remaining soil is backfilled to the remaining soil in-situ disposal construction area; when construction is conducted to the residual soil displacement treatment construction area, the residual soil is backfilled to a specific structure backfilling area; and covering the stripped surface soil. According to the technical scheme, the condition of water and soil loss caused by unfavorable disposal of the residual soil in temporary road construction is avoided, and earth-rock balance in the temporary road construction range is realized by adopting a mode of combining in-situ disposal and ectopic disposal of the residual soil.
本发明公开了一种输变电工程山丘区临时道路施工扰动的余土处置方法,属于土石方施工技术领域,包括:获取以塔基为中心的预设范围内的地形参数;依据所述地形参数确定施工线路;根据所述地形参数中的施工区域的坡度值确定余土原位处置施工区域和余土异位处置施工区域;施工时将施工区表土剥离并堆放在特定地点;施工至余土原位处置施工区域时,将余土回填至所述余土原位处置施工区域;施工至余土异位处置施工区域时,将余土回填至特定结构回填区;将剥离的表土回覆。本发明技术方案避免了临时道路施工余土处置不利导致的水土流失状况,通过采用余土原位处置、异位处置相结合的方式,实现临时道路施工范围内的土石方平衡。
Remaining soil treatment method for temporary road construction disturbance in power transmission and transformation project hilly region
输变电工程山丘区临时道路施工扰动的余土处置方法
HONG QIAN (author) / YU YUQING (author) / CHEN XIAOFENG (author) / LI XI (author) / SHI YUANPING (author) / ZHANG CAN (author) / LI XUAN (author) / WANG XIJIN (author)
2022-06-28
Patent
Electronic Resource
Chinese
IPC:
E02D
FOUNDATIONS
,
Gründungen
European Patent Office | 2023
|Soil-cement road building in hilly country
Engineering Index Backfile | 1940
|Temporary Road and Construction Method and Block for Temporary Road
European Patent Office | 2016