A platform for research: civil engineering, architecture and urbanism
Water meter room pipeline modularization construction method
The invention relates to the technical field of building pipelines, and discloses a modular construction method for a water meter room pipeline, the water meter room pipeline is installed on a support, the water meter room pipeline comprises a water supply vertical pipe, a water supply branch pipe connected with the water supply vertical pipe and a water supply pipe section, the water supply pipe section comprises a main valve group module, a water meter module and a water supply pipe used for home entry, and the main valve group module, the water meter module and the water supply pipe are sequentially connected. The construction method comprises the following steps that a water supply pipe section and support BIM general family library of the water meter room is established; building a water meter room BIM model and designing electromechanical pipelines; a water meter room pipeline and a support are modularly designed; prefabricating a main valve group module, a water meter module, a water supply pipe and a bracket module; field paying-off and module installation are carried out; and testing pressure and washing. During construction, the modules can be prefabricated in batches, and the quality can be guaranteed. And only two types of pipeline connection are adopted during construction, so that the types of mounting tools and mounting procedures are reduced, machinery is not needed, the occupied mounting space is small, and the safety in the mounting process is improved.
本发明涉及建筑管道技术领域,公开了一种水表房管道模块化施工方法,水表房管道安装在支架上,其包括给水立管、与所述给水立管连接的给水支管和给水管段,所述给水管段包括依次连接的总阀组模块、水表模块和用于入户的送水管,其施工方法包括以下步骤:建立水表房的所述给水管段及支架BIM通用族库;建立水表房BIM模型及机电管线设计;水表房管道和支架的模块化设计;预制总阀组模块、水表模块、送水管及支架模块;现场放线及模块安装;试压与冲洗。本发明施工时可以先进行模块的批量预制,不仅质量能得到保证。而且施工时管道连接只有两种,减少了安装工具的种类及安装的工序,不需使用机械,安装空间占用小,提高了安装过程的安全性。
Water meter room pipeline modularization construction method
The invention relates to the technical field of building pipelines, and discloses a modular construction method for a water meter room pipeline, the water meter room pipeline is installed on a support, the water meter room pipeline comprises a water supply vertical pipe, a water supply branch pipe connected with the water supply vertical pipe and a water supply pipe section, the water supply pipe section comprises a main valve group module, a water meter module and a water supply pipe used for home entry, and the main valve group module, the water meter module and the water supply pipe are sequentially connected. The construction method comprises the following steps that a water supply pipe section and support BIM general family library of the water meter room is established; building a water meter room BIM model and designing electromechanical pipelines; a water meter room pipeline and a support are modularly designed; prefabricating a main valve group module, a water meter module, a water supply pipe and a bracket module; field paying-off and module installation are carried out; and testing pressure and washing. During construction, the modules can be prefabricated in batches, and the quality can be guaranteed. And only two types of pipeline connection are adopted during construction, so that the types of mounting tools and mounting procedures are reduced, machinery is not needed, the occupied mounting space is small, and the safety in the mounting process is improved.
本发明涉及建筑管道技术领域,公开了一种水表房管道模块化施工方法,水表房管道安装在支架上,其包括给水立管、与所述给水立管连接的给水支管和给水管段,所述给水管段包括依次连接的总阀组模块、水表模块和用于入户的送水管,其施工方法包括以下步骤:建立水表房的所述给水管段及支架BIM通用族库;建立水表房BIM模型及机电管线设计;水表房管道和支架的模块化设计;预制总阀组模块、水表模块、送水管及支架模块;现场放线及模块安装;试压与冲洗。本发明施工时可以先进行模块的批量预制,不仅质量能得到保证。而且施工时管道连接只有两种,减少了安装工具的种类及安装的工序,不需使用机械,安装空间占用小,提高了安装过程的安全性。
Water meter room pipeline modularization construction method
一种水表房管道模块化施工方法
TANG BOLONG (author) / LIN WENQING (author) / QIU HUILING (author) / SITU CONG (author) / PENG FEI (author) / JIANG JIAPEI (author) / DENG JIAHONG (author) / CHEN ZHAOFENG (author) / LUO SHAOGUANG (author) / TAN DAHUI (author)
2022-06-28
Patent
Electronic Resource
Chinese
IPC:
E03B
Anlagen oder Verfahren zum Gewinnen, Sammeln oder Verteilen von Wasser
,
INSTALLATIONS OR METHODS FOR OBTAINING, COLLECTING, OR DISTRIBUTING WATER
Modularization speeds construction
Tema Archive | 1998
|MODULARIZATION METHOD FOR BUILDING DESIGN, FABRICATION AND CONSTRUCTION
European Patent Office | 2020
|Lean, Automation And Modularization In Construction
TIBKAT | 2020
|Indoor wall decoration modularization system and construction method
European Patent Office | 2023
|Indoor wall decoration modularization system and construction method
European Patent Office | 2024
|