A platform for research: civil engineering, architecture and urbanism
Large industrial building concrete roof and repairing construction method
The invention provides a large-size industrial building concrete roof and a repairing construction method. The large-size industrial building concrete roof comprises a repairing layer laid on a concrete base layer, the repairing layer comprises a high-density combining layer and a waterproof film, the high-density combining layer is laid on the concrete base layer, the waterproof film is laid on the high-density combining layer, and the large-size industrial building concrete roof further comprises a breathing system laid in the repairing layer; according to the method, the structure is reasonable, the service life is prolonged by repairing and treating roof leakage and improving and improving the use function of a rigid layer in the existing state, meanwhile, the use function of a roof drainage system is improved, the drainage efficiency is greatly improved, and multiple functions including people access, normal use of roof equipment, energy conservation, heat preservation, water prevention and the like are comprehensively, systematically and integrally improved.
本发明提供本发明的一种大体量工业建筑砼屋面及修缮工法,包括铺设在砼基层上的修缮层,修缮层包括高密度结合层和防水膜,高密度结合层铺设在砼基层上,防水膜铺设在高密度结合层上,还包括铺设在修缮层内的呼吸系统;本法发明结构合理,通过修缮,治理屋面渗漏、改善并提高刚性层现状态的使用功能延长其使用寿命,同时改善屋面排水系统使用功能大幅提高排水效能,涵盖上人、屋面设备正常使用、节能保温、防水等多项功能全面、系统地进行整体改观。
Large industrial building concrete roof and repairing construction method
The invention provides a large-size industrial building concrete roof and a repairing construction method. The large-size industrial building concrete roof comprises a repairing layer laid on a concrete base layer, the repairing layer comprises a high-density combining layer and a waterproof film, the high-density combining layer is laid on the concrete base layer, the waterproof film is laid on the high-density combining layer, and the large-size industrial building concrete roof further comprises a breathing system laid in the repairing layer; according to the method, the structure is reasonable, the service life is prolonged by repairing and treating roof leakage and improving and improving the use function of a rigid layer in the existing state, meanwhile, the use function of a roof drainage system is improved, the drainage efficiency is greatly improved, and multiple functions including people access, normal use of roof equipment, energy conservation, heat preservation, water prevention and the like are comprehensively, systematically and integrally improved.
本发明提供本发明的一种大体量工业建筑砼屋面及修缮工法,包括铺设在砼基层上的修缮层,修缮层包括高密度结合层和防水膜,高密度结合层铺设在砼基层上,防水膜铺设在高密度结合层上,还包括铺设在修缮层内的呼吸系统;本法发明结构合理,通过修缮,治理屋面渗漏、改善并提高刚性层现状态的使用功能延长其使用寿命,同时改善屋面排水系统使用功能大幅提高排水效能,涵盖上人、屋面设备正常使用、节能保温、防水等多项功能全面、系统地进行整体改观。
Large industrial building concrete roof and repairing construction method
一种大体量工业建筑砼屋面及修缮工法
FU XIANXIN (author) / FEI WEIBIAO (author) / CHENG ZHIRAN (author)
2022-07-01
Patent
Electronic Resource
Chinese
Building concrete crack repairing construction technology
European Patent Office | 2020
|