Construction method for emergency disaster relief station
The invention discloses a construction method of an emergency disaster relief station. The construction method comprises the following steps that a, a bottom fixing structure is installed; b, mounting a top structure; c, the top structure is installed on the bottom fixing structure; d, the positioning columns and the adjusting columns are reinforced; e, mounting a bearing frame; f, mounting a lateral steel plate; g, the first baffle and the second baffle are welded; and h, assembling and connecting the mounting units. The top structure and the bottom fixing structure can be kept at a set height, the top structure can be pre-mounted during mounting, the top structure can be accurately positioned and the set height of the top structure can be limited in a hoisting and cylinder pushing manner, and the stability of the top structure on the bottom fixing structure can be improved; the mounting unit is made to have enough strength, the requirement for hanging the mounting unit is met, the top structure and the bottom fixing structure have certain space for arranging pipelines and water pipes, and the pipelines and the water pipes are protected.
本发明公开了一种紧急救灾所施工方法,包括如下步骤:a、底部固定结构安装;b、顶部结构安装;c、将顶部结构安装到底部固定结构上;d、对定位柱和调整柱进行加固;e、承重架安装;f、安装侧向钢板;g、焊接第一挡板和第二挡板;h、对安装单元进行拼装连接。能使得顶部结构和底部固定结构之间保持设定高度,在安装时,可将顶部结构预先安装得到,通过吊装和气缸顶推的方式,能将顶部结构精准落位,并对顶部结构的设置高度进行限定,而且能增加顶部结构在底部固定结构上的稳定性,使得安装单元具体足够的强度,满足对安装单元进行吊放需求,而且顶部结构和底部固定结构具有一定空间用于设置管线和水管,且对管线和水管起到保护作用。
Construction method for emergency disaster relief station
The invention discloses a construction method of an emergency disaster relief station. The construction method comprises the following steps that a, a bottom fixing structure is installed; b, mounting a top structure; c, the top structure is installed on the bottom fixing structure; d, the positioning columns and the adjusting columns are reinforced; e, mounting a bearing frame; f, mounting a lateral steel plate; g, the first baffle and the second baffle are welded; and h, assembling and connecting the mounting units. The top structure and the bottom fixing structure can be kept at a set height, the top structure can be pre-mounted during mounting, the top structure can be accurately positioned and the set height of the top structure can be limited in a hoisting and cylinder pushing manner, and the stability of the top structure on the bottom fixing structure can be improved; the mounting unit is made to have enough strength, the requirement for hanging the mounting unit is met, the top structure and the bottom fixing structure have certain space for arranging pipelines and water pipes, and the pipelines and the water pipes are protected.
本发明公开了一种紧急救灾所施工方法,包括如下步骤:a、底部固定结构安装;b、顶部结构安装;c、将顶部结构安装到底部固定结构上;d、对定位柱和调整柱进行加固;e、承重架安装;f、安装侧向钢板;g、焊接第一挡板和第二挡板;h、对安装单元进行拼装连接。能使得顶部结构和底部固定结构之间保持设定高度,在安装时,可将顶部结构预先安装得到,通过吊装和气缸顶推的方式,能将顶部结构精准落位,并对顶部结构的设置高度进行限定,而且能增加顶部结构在底部固定结构上的稳定性,使得安装单元具体足够的强度,满足对安装单元进行吊放需求,而且顶部结构和底部固定结构具有一定空间用于设置管线和水管,且对管线和水管起到保护作用。
Construction method for emergency disaster relief station
一种紧急救灾所施工方法