Construction method for breaking and removing soil between piles and pile heads of over-pouring cast-in-place piles
The invention relates to the technical field of cast-in-place pile construction, and discloses an over-pouring cast-in-place pile inter-pile soil and pile head breaking construction method.Soil layer excavation is carried out from the area with the large cast-in-place pile spacing to the area with the small cast-in-place pile spacing, when the soil layer cannot be directly excavated due to the fact that the pile spacing is too small, the soil layer between cast-in-place piles is broken through a pile driver, and the pile head of the cast-in-place piles is removed; then the soil body is transported to an open area of the foundation pit to be cleaned; then, two annular cutting seams are cut in the positions, close to the bottom of the foundation pit, of the pile head through an annular cutting device; then, the concrete between the two annular cutting seams is broken and removed, and then the reinforcement cage is fused in the circumferential direction through a welding gun; and afterwards, the pile head is hung through a crane, then the pile head is sawed down from the cast-in-place pile along the fusing seam of the reinforcement cage, and then the sawed-down pile head is hung out of the foundation pit. The construction method has the effects that soil between piles can be rapidly removed, the pile heads of the cast-in-place piles can be rapidly broken, and the construction efficiency is improved.
本申请涉及灌注桩施工的技术领域,本申请公开了一种超灌灌注桩桩间土及桩头破除施工方法,土层开挖从灌注桩桩间距大的区域至桩间距小的区域进行当桩间距过小导致不能直接开挖土层时,利用打桩机将灌注桩之间的土层破碎,然后将土体运输至基坑空旷区域进行清理;然后利用环切装置在桩头靠近基坑底部处切出两道环形切割缝;紧接着将两道环形切割缝之间的混凝土破除,再利用焊枪将钢筋笼沿周向熔断;之后,通过吊机吊住桩头,再沿着钢筋笼的熔断缝将桩头从灌注桩上锯下,接着将被锯下的桩头吊出基坑即可。本申请具有实现对桩间土的快速清除和灌注桩桩头的快速破除,以提高施工效率的效果。
Construction method for breaking and removing soil between piles and pile heads of over-pouring cast-in-place piles
The invention relates to the technical field of cast-in-place pile construction, and discloses an over-pouring cast-in-place pile inter-pile soil and pile head breaking construction method.Soil layer excavation is carried out from the area with the large cast-in-place pile spacing to the area with the small cast-in-place pile spacing, when the soil layer cannot be directly excavated due to the fact that the pile spacing is too small, the soil layer between cast-in-place piles is broken through a pile driver, and the pile head of the cast-in-place piles is removed; then the soil body is transported to an open area of the foundation pit to be cleaned; then, two annular cutting seams are cut in the positions, close to the bottom of the foundation pit, of the pile head through an annular cutting device; then, the concrete between the two annular cutting seams is broken and removed, and then the reinforcement cage is fused in the circumferential direction through a welding gun; and afterwards, the pile head is hung through a crane, then the pile head is sawed down from the cast-in-place pile along the fusing seam of the reinforcement cage, and then the sawed-down pile head is hung out of the foundation pit. The construction method has the effects that soil between piles can be rapidly removed, the pile heads of the cast-in-place piles can be rapidly broken, and the construction efficiency is improved.
本申请涉及灌注桩施工的技术领域,本申请公开了一种超灌灌注桩桩间土及桩头破除施工方法,土层开挖从灌注桩桩间距大的区域至桩间距小的区域进行当桩间距过小导致不能直接开挖土层时,利用打桩机将灌注桩之间的土层破碎,然后将土体运输至基坑空旷区域进行清理;然后利用环切装置在桩头靠近基坑底部处切出两道环形切割缝;紧接着将两道环形切割缝之间的混凝土破除,再利用焊枪将钢筋笼沿周向熔断;之后,通过吊机吊住桩头,再沿着钢筋笼的熔断缝将桩头从灌注桩上锯下,接着将被锯下的桩头吊出基坑即可。本申请具有实现对桩间土的快速清除和灌注桩桩头的快速破除,以提高施工效率的效果。
Construction method for breaking and removing soil between piles and pile heads of over-pouring cast-in-place piles
一种超灌灌注桩桩间土及桩头破除施工方法
HAN JINGYU (author) / ZHENG YUMING (author) / ZHOU XIONG (author) / LI ZONGWEN (author) / YE QINGHUI (author) / GUO HU (author) / ZHANG PENGFEI (author) / WANG PENGCHAO (author)
2022-07-08
Patent
Electronic Resource
Chinese
IPC:
E02D
FOUNDATIONS
,
Gründungen
Cast-in-place construction process for inter-pile board wall between slide-resistant piles
European Patent Office | 2015
|Device for removing soil between piles and construction method
European Patent Office | 2023
|Online Contents | 1983
|Engineering Index Backfile | 1935
|British Library Conference Proceedings | 1988
|