The invention relates to a reinforced concrete silo roof formwork construction method which comprises the following steps: after silo wall slip form construction is completed, descending a slip form platform to a preset elevation for the first time and then reinforcing the slip form platform to serve as a roof formwork supporting platform for silo roof construction; and after construction of the silo top plate is completed, the slip form platform descends to the ground for the second time, and the slip form platform is overall dismantled. And the lowered and fixed slip form platform is used as an operation platform for dismantling the slip form lifting frame and the template, so that the workload and the safety risk of hoisting on the top surface of the vertical silo are reduced. The slip form platform serves as a supporting point and a working face for supporting the silo top plate formwork, the construction process is simple, operation is convenient, cost is reduced, and the construction progress is accelerated. The slip form platform is disassembled on the ground after descending for the second time, operators do not need to work high above the ground, the risk of working high above the ground is greatly reduced, and the safety degree of construction work is improved.
本发明涉及一种钢筋混凝土筒仓顶板模板施工方法,筒仓壁滑模施工完成后,将滑模平台第一次下降至预定标高后加固,作为筒仓顶板施工的顶板模板支撑平台;筒仓顶板施工完成后,将滑模平台第二次下降至至地面并将滑模平台整体拆除。下降固定后的滑模平台作为拆除滑模提升架及模板的操作平台,减少在立筒仓顶面吊运的工作量和安全风险。滑模平台作为筒仓顶板模板的支撑的支撑点和工作面,施工过程简单,操作方便,费用减少,使施工进度加快。滑模平台进行第二次下降后在地面进行拆解,操作人员不必在高空作业,大大的减少了高空作业的风险,提高了施工作业的安全度。
Reinforced concrete silo top plate formwork construction method
The invention relates to a reinforced concrete silo roof formwork construction method which comprises the following steps: after silo wall slip form construction is completed, descending a slip form platform to a preset elevation for the first time and then reinforcing the slip form platform to serve as a roof formwork supporting platform for silo roof construction; and after construction of the silo top plate is completed, the slip form platform descends to the ground for the second time, and the slip form platform is overall dismantled. And the lowered and fixed slip form platform is used as an operation platform for dismantling the slip form lifting frame and the template, so that the workload and the safety risk of hoisting on the top surface of the vertical silo are reduced. The slip form platform serves as a supporting point and a working face for supporting the silo top plate formwork, the construction process is simple, operation is convenient, cost is reduced, and the construction progress is accelerated. The slip form platform is disassembled on the ground after descending for the second time, operators do not need to work high above the ground, the risk of working high above the ground is greatly reduced, and the safety degree of construction work is improved.
本发明涉及一种钢筋混凝土筒仓顶板模板施工方法,筒仓壁滑模施工完成后,将滑模平台第一次下降至预定标高后加固,作为筒仓顶板施工的顶板模板支撑平台;筒仓顶板施工完成后,将滑模平台第二次下降至至地面并将滑模平台整体拆除。下降固定后的滑模平台作为拆除滑模提升架及模板的操作平台,减少在立筒仓顶面吊运的工作量和安全风险。滑模平台作为筒仓顶板模板的支撑的支撑点和工作面,施工过程简单,操作方便,费用减少,使施工进度加快。滑模平台进行第二次下降后在地面进行拆解,操作人员不必在高空作业,大大的减少了高空作业的风险,提高了施工作业的安全度。
Reinforced concrete silo top plate formwork construction method
钢筋混凝土筒仓顶板模板施工方法
ZHANG RONGTAI (author) / ZHU WENJUN (author) / LI LIHONG (author) / ZHU JINXIA (author)
2022-07-12
Patent
Electronic Resource
Chinese
IPC:
E04G
SCAFFOLDING
,
Baugerüste
Formwork equipment for slip form construction of concrete silo
European Patent Office | 2024
|Construction of reinforced concrete silo
Engineering Index Backfile | 1965
|Rapid reinforced concrete silo construction
Engineering Index Backfile | 1933
Squat silo bottom plate cone hopper concrete slope-piling formwork erecting method
European Patent Office | 2022
|