A platform for research: civil engineering, architecture and urbanism
Drainage pipeline for building construction
The invention relates to the technical field of building construction, and discloses a drainage pipeline for building construction, which comprises a drainage pipeline main body, a first fixed shell and a water distribution pipe are respectively mounted at two ends of the upper end of the outer part of the drainage pipeline main body, and the first fixed shell and the water distribution pipe are fixedly connected with the drainage pipeline main body; a first control valve is installed on one side of the lower end in the water distribution pipe, a buffer pipe is installed in the middle of the interior of the water distribution pipe, the buffer pipe and the water distribution pipe are fixed in a sealed mode, a buffer piston disc is installed in the buffer pipe, and a pressure gauge and a pressurizing pipe are installed on one side of the upper end of the exterior of the buffer pipe; a second control valve is installed on the side, close to the first control valve, in the drainage pipeline body, and a check valve is installed at the end, away from the first control valve, in the water distribution pipe. According to the pipeline, water flow is divided through the water dividing pipe, so that the influence caused by cut-off cleaning of the filtering structure is prevented.
本发明涉及建筑施工技术领域,且公开了一种建筑施工用排水管道,包括排水管道主体,所述排水管道主体外部上端的两端分别安装有第一固定外壳和分水管,且第一固定外壳和分水管与排水管道主体固定连接,所述分水管内部下端的一侧安装有第一控制阀,所述分水管内部中间的位置处安装有缓冲管,且缓冲管与分水管密封固定,所述缓冲管的内部安装有缓冲活塞盘,所述缓冲管外部上端的一侧安装有压力表和加压管,所述排水管道主体内部靠近第一控制阀的一侧安装有第二控制阀,所述分水管内部远离第一控制阀的一端安装有止回阀。该管道通过分水管对水流进行分流,从而防止了断流清理过滤结构造成的影响。
Drainage pipeline for building construction
The invention relates to the technical field of building construction, and discloses a drainage pipeline for building construction, which comprises a drainage pipeline main body, a first fixed shell and a water distribution pipe are respectively mounted at two ends of the upper end of the outer part of the drainage pipeline main body, and the first fixed shell and the water distribution pipe are fixedly connected with the drainage pipeline main body; a first control valve is installed on one side of the lower end in the water distribution pipe, a buffer pipe is installed in the middle of the interior of the water distribution pipe, the buffer pipe and the water distribution pipe are fixed in a sealed mode, a buffer piston disc is installed in the buffer pipe, and a pressure gauge and a pressurizing pipe are installed on one side of the upper end of the exterior of the buffer pipe; a second control valve is installed on the side, close to the first control valve, in the drainage pipeline body, and a check valve is installed at the end, away from the first control valve, in the water distribution pipe. According to the pipeline, water flow is divided through the water dividing pipe, so that the influence caused by cut-off cleaning of the filtering structure is prevented.
本发明涉及建筑施工技术领域,且公开了一种建筑施工用排水管道,包括排水管道主体,所述排水管道主体外部上端的两端分别安装有第一固定外壳和分水管,且第一固定外壳和分水管与排水管道主体固定连接,所述分水管内部下端的一侧安装有第一控制阀,所述分水管内部中间的位置处安装有缓冲管,且缓冲管与分水管密封固定,所述缓冲管的内部安装有缓冲活塞盘,所述缓冲管外部上端的一侧安装有压力表和加压管,所述排水管道主体内部靠近第一控制阀的一侧安装有第二控制阀,所述分水管内部远离第一控制阀的一端安装有止回阀。该管道通过分水管对水流进行分流,从而防止了断流清理过滤结构造成的影响。
Drainage pipeline for building construction
一种建筑施工用排水管道
CAO SHUWU (author) / CHEN WENHUA (author) / CAO LONGMEI (author)
2022-07-15
Patent
Electronic Resource
Chinese
Drainage pipeline mounting device for building construction
European Patent Office | 2022
|Auxiliary drainage structure of building drainage pipeline
European Patent Office | 2023
|