A platform for research: civil engineering, architecture and urbanism
Curtain wall construction platform
The curtain wall construction platform comprises a bearing plate and at least two sets of support units arranged between floors side by side, each support unit comprises a first vertical rod, a second vertical rod and a support arm, the first vertical rod and the second vertical rod are perpendicularly arranged on a floor bottom plate, and the support arm is perpendicularly connected with the first vertical rod and the second vertical rod. The supporting arms extend out of a floor bottom plate and are close to a window frame upper eave between floors, the top ends of the first vertical rods abut against a floor top plate, and the bearing plates are arranged on the portions, overhung out of the floor bottom plate, of the adjacent supporting arms. The first vertical rod and the second vertical rod are arranged between floors and used for lifting the supporting arm to the set height, the bearing plate is erected on the part, overhung out of the bottom plate, of the supporting arm, a platform for construction personnel to construct a curtain wall is formed, operation of the construction personnel is facilitated, the construction efficiency and the construction quality are improved, and the construction cost is reduced. The problems of time and labor consumption, high construction cost and poor construction quality due to adoption of a high-altitude crank arm vehicle or erection of a scaffold in the conventional curtain wall construction are solved.
本发明公开了一种幕墙施工平台,包括承载板和并排设置在楼层间的至少两组支架单元,所述支架单元包括垂直设置在楼层底板上的第一立杆和第二立杆以及与所述第一立杆和第二立杆垂直连接的支臂,所述支臂延伸出楼层底板并靠近所述楼层间的窗框上檐,所述第一立杆的顶端与楼层顶板抵靠,所述承载板设置在相邻的所述支臂上悬挑出楼层底板的部分;本发明通过在楼层间设置第一立杆和第二立杆,并用于将支臂抬升到设定高度,通过在悬挑出底板的支臂部分搭设承载板,形成用于施工人员施工幕墙的平台,便于施工人员操作,提供施工效率和施工质量,避免了以往的幕墙施工采用高空曲臂车或者搭设脚手架,耗时耗力,施工成本高且施工质量差的问题。
Curtain wall construction platform
The curtain wall construction platform comprises a bearing plate and at least two sets of support units arranged between floors side by side, each support unit comprises a first vertical rod, a second vertical rod and a support arm, the first vertical rod and the second vertical rod are perpendicularly arranged on a floor bottom plate, and the support arm is perpendicularly connected with the first vertical rod and the second vertical rod. The supporting arms extend out of a floor bottom plate and are close to a window frame upper eave between floors, the top ends of the first vertical rods abut against a floor top plate, and the bearing plates are arranged on the portions, overhung out of the floor bottom plate, of the adjacent supporting arms. The first vertical rod and the second vertical rod are arranged between floors and used for lifting the supporting arm to the set height, the bearing plate is erected on the part, overhung out of the bottom plate, of the supporting arm, a platform for construction personnel to construct a curtain wall is formed, operation of the construction personnel is facilitated, the construction efficiency and the construction quality are improved, and the construction cost is reduced. The problems of time and labor consumption, high construction cost and poor construction quality due to adoption of a high-altitude crank arm vehicle or erection of a scaffold in the conventional curtain wall construction are solved.
本发明公开了一种幕墙施工平台,包括承载板和并排设置在楼层间的至少两组支架单元,所述支架单元包括垂直设置在楼层底板上的第一立杆和第二立杆以及与所述第一立杆和第二立杆垂直连接的支臂,所述支臂延伸出楼层底板并靠近所述楼层间的窗框上檐,所述第一立杆的顶端与楼层顶板抵靠,所述承载板设置在相邻的所述支臂上悬挑出楼层底板的部分;本发明通过在楼层间设置第一立杆和第二立杆,并用于将支臂抬升到设定高度,通过在悬挑出底板的支臂部分搭设承载板,形成用于施工人员施工幕墙的平台,便于施工人员操作,提供施工效率和施工质量,避免了以往的幕墙施工采用高空曲臂车或者搭设脚手架,耗时耗力,施工成本高且施工质量差的问题。
Curtain wall construction platform
一种幕墙施工平台
LI ZHENG (author) / WANG KE (author) / WANG JINGLEI (author) / LIU DAN (author) / ZHENG MINGLIN (author) / XING LICHAO (author) / DUANMU YONGZHENG (author) / HE TENGFEI (author) / SONG JIAN (author) / PENG GUANGMOU (author)
2022-07-15
Patent
Electronic Resource
Chinese
IPC:
E04G
SCAFFOLDING
,
Baugerüste
Curtain wall construction platform and using method thereof
European Patent Office | 2024
|