Building construction composite geomembrane laying method
The invention relates to the technical field, in particular to a building construction composite geomembrane laying method which comprises the steps that S1, a composite geomembrane of a composite geomembrane roll sequentially passes through a first auxiliary roller, an upper pinch roller, a lower pinch roller, a second auxiliary roller and a third auxiliary roller to be laid in a lap joint mode; s2, the composite geomembrane is placed on the lower side of a compacting and laying roller, a bearing plate is pressed downwards through an electric push rod, and the compacting and laying roller compacts the composite geomembrane; s3, the loading frame 2 is moved, meanwhile, an air cylinder is regulated and controlled to regulate and control an upper clamping and conveying roller, the upper clamping and conveying roller and a lower clamping and conveying roller are made to clamp and convey the composite geomembrane, and clamping, conveying, compacting and laying of the composite geomembrane are achieved; and through the upper pinch roll and the lower pinch roll, clamping and conveying of the composite geomembrane can be easy and convenient, the laying tension degree of the composite geomembrane is high, and the overall laying quality and effect are good.
本发明涉及技术领域,具体为一种建筑施工复合土工膜铺设方法,S1,通过将复合土工膜卷的复合土工膜依次经过第一辅助辊、上夹送辊、下夹送辊、第二辅助辊、第三辅助辊进行搭接铺设;S2,将复合土工膜放置在压实铺设辊的下侧,通过电动推杆对承接板进行下压,使压实铺设辊对复合土工膜进行压实;S3,通过对装载架2进行移动,同时调控气缸对上夹送辊进行调控,使上夹送辊和下夹送辊对复合土工膜进行夹送,实现复合土工膜夹送和压实铺设;通过上夹送辊和下夹送辊能够使复合土工膜的夹送简单方便,使复合土工膜的铺设张紧度较高,使整体的铺设质量和效果较好。
Building construction composite geomembrane laying method
The invention relates to the technical field, in particular to a building construction composite geomembrane laying method which comprises the steps that S1, a composite geomembrane of a composite geomembrane roll sequentially passes through a first auxiliary roller, an upper pinch roller, a lower pinch roller, a second auxiliary roller and a third auxiliary roller to be laid in a lap joint mode; s2, the composite geomembrane is placed on the lower side of a compacting and laying roller, a bearing plate is pressed downwards through an electric push rod, and the compacting and laying roller compacts the composite geomembrane; s3, the loading frame 2 is moved, meanwhile, an air cylinder is regulated and controlled to regulate and control an upper clamping and conveying roller, the upper clamping and conveying roller and a lower clamping and conveying roller are made to clamp and convey the composite geomembrane, and clamping, conveying, compacting and laying of the composite geomembrane are achieved; and through the upper pinch roll and the lower pinch roll, clamping and conveying of the composite geomembrane can be easy and convenient, the laying tension degree of the composite geomembrane is high, and the overall laying quality and effect are good.
本发明涉及技术领域,具体为一种建筑施工复合土工膜铺设方法,S1,通过将复合土工膜卷的复合土工膜依次经过第一辅助辊、上夹送辊、下夹送辊、第二辅助辊、第三辅助辊进行搭接铺设;S2,将复合土工膜放置在压实铺设辊的下侧,通过电动推杆对承接板进行下压,使压实铺设辊对复合土工膜进行压实;S3,通过对装载架2进行移动,同时调控气缸对上夹送辊进行调控,使上夹送辊和下夹送辊对复合土工膜进行夹送,实现复合土工膜夹送和压实铺设;通过上夹送辊和下夹送辊能够使复合土工膜的夹送简单方便,使复合土工膜的铺设张紧度较高,使整体的铺设质量和效果较好。
Building construction composite geomembrane laying method
一种建筑施工复合土工膜铺设方法
WU YANGSHENG (author) / XU JIAN'AN (author) / CHENG QI (author) / GUI JINJIE (author) / JIANG XULIN (author) / WU YUANPING (author)
2022-07-29
Patent
Electronic Resource
Chinese
Building construction composite geomembrane laying method
European Patent Office | 2020
|Building construction composite geomembrane laying method
European Patent Office | 2021
|Hydraulic engineering construction geomembrane laying method
European Patent Office | 2021
|