Foundation pit drainage system for enriching karst fissure water and construction method
The invention discloses a karst fissure water-rich foundation pit drainage system and a construction method, relates to the technical field of foundation pit drainage, solves the problem that drainage cannot be conducted in time during karst fissure water-rich stratum foundation pit construction, and avoids structural construction area water accumulation caused by large underground water yield. According to the specific scheme, the structure comprises a replacement and filling water storage layer, drainage ditches and a water collecting pit which are arranged in a foundation pit, the replacement and filling water storage layer has a water storage function, the multiple drainage ditches are arranged at the bottom of the replacement and filling water storage layer and are transversely and longitudinally arranged in a crossed mode to form a net-shaped structure, and at least one drainage pipe is arranged in each drainage ditch; the water collecting pit is located at the bottom of the replacing and filling water storage layer, at least one water collecting tank is arranged in the water collecting pit, a well pipe is arranged on the top of the water collecting tank, a water pump is arranged in the water collecting tank, and a water pipe of the water pump extends out of the bottom plate through the well pipe.
本发明公开了一种用于岩溶裂隙水丰富基坑排水系统及施工方法,涉及基坑排水技术领域,解决了岩溶裂隙水丰富地层基坑施工无法及时排水的问题,避免了地下水出水量大导致的结构施工面积水,具体方案如下:包括布置在基坑内的换填蓄水层、排水沟以及集水坑,所述换填蓄水层具有储水功能,换填蓄水层的底部设有若干排水沟,若干排水沟横向、纵向交叉布置以形成网状结构,每个排水沟内至少设有一根排水管,所述集水坑位于换填蓄水层的底部,所述集水坑内至少设有一个集水箱,所述集水箱的顶部设有井管,集水箱的内部设有水泵,水泵的水管通过井管伸出底板。
Foundation pit drainage system for enriching karst fissure water and construction method
The invention discloses a karst fissure water-rich foundation pit drainage system and a construction method, relates to the technical field of foundation pit drainage, solves the problem that drainage cannot be conducted in time during karst fissure water-rich stratum foundation pit construction, and avoids structural construction area water accumulation caused by large underground water yield. According to the specific scheme, the structure comprises a replacement and filling water storage layer, drainage ditches and a water collecting pit which are arranged in a foundation pit, the replacement and filling water storage layer has a water storage function, the multiple drainage ditches are arranged at the bottom of the replacement and filling water storage layer and are transversely and longitudinally arranged in a crossed mode to form a net-shaped structure, and at least one drainage pipe is arranged in each drainage ditch; the water collecting pit is located at the bottom of the replacing and filling water storage layer, at least one water collecting tank is arranged in the water collecting pit, a well pipe is arranged on the top of the water collecting tank, a water pump is arranged in the water collecting tank, and a water pipe of the water pump extends out of the bottom plate through the well pipe.
本发明公开了一种用于岩溶裂隙水丰富基坑排水系统及施工方法,涉及基坑排水技术领域,解决了岩溶裂隙水丰富地层基坑施工无法及时排水的问题,避免了地下水出水量大导致的结构施工面积水,具体方案如下:包括布置在基坑内的换填蓄水层、排水沟以及集水坑,所述换填蓄水层具有储水功能,换填蓄水层的底部设有若干排水沟,若干排水沟横向、纵向交叉布置以形成网状结构,每个排水沟内至少设有一根排水管,所述集水坑位于换填蓄水层的底部,所述集水坑内至少设有一个集水箱,所述集水箱的顶部设有井管,集水箱的内部设有水泵,水泵的水管通过井管伸出底板。
Foundation pit drainage system for enriching karst fissure water and construction method
一种用于岩溶裂隙水丰富基坑排水系统及施工方法
ZHANG CHUANQIANG (author) / KONG LINGKUN (author) / WANG TENG (author) / YU YANG (author) / LUO WEI (author) / ZHANG DONGDONG (author) / QIAO NAN (author) / LI FANG (author) / DONG SHUANG (author) / MA XIAOZHEN (author)
2022-07-29
Patent
Electronic Resource
Chinese
IPC:
E02D
FOUNDATIONS
,
Gründungen
Mudstone natural foundation fissure water drainage construction method
European Patent Office | 2021
|Karst area foundation pit drainage treatment method in construction
European Patent Office | 2023
|Device and method for plugging gushing karst fissure water
European Patent Office | 2021
|Karst geology foundation pit dewatering and drainage structure and construction method
European Patent Office | 2023
|Karst area pile foundation construction method and karst area pile foundation construction device
European Patent Office | 2022
|