Method for fixing anti-seepage geotextile in separation strip
The invention discloses a method for fixing anti-seepage geotextile in a separation strip, and relates to the field of road construction. The method for fixing the anti-seepage geotechnical cloth in the separation strip comprises the following steps that before curbstone rear berm concrete on the two sides of the separation strip is finally set, one ends of a plurality of hooks are pre-embedded into the curbstone rear berm concrete on the two sides at intervals; after anti-seepage geotechnical cloth is laid in the separation strip, the two ends of the anti-seepage geotechnical cloth are wound and fixed to at least one connecting block respectively, then the connecting blocks are connected to the other ends of the hooks embedded in the curbstone rear prop concrete on the corresponding sides in a clamped mode respectively, and fixing of the anti-seepage geotechnical cloth is completed after the curbstone rear prop concrete is finally set. According to the method for fixing the anti-seepage geotechnical cloth in the separation strip, the anti-seepage geotechnical cloth can be stably fixed, and the fixed anti-seepage geotechnical cloth is effectively prevented from being torn and damaged when sliding down.
一种分隔带内防渗土工布固定方法,涉及道路施工领域。该分隔带内防渗土工布固定方法包括以下步骤:在分隔带两侧的侧石后戗混凝土终凝前,将多个挂钩的一端间隔预埋至两侧的侧石后戗混凝土内;在分隔带内铺设防渗土工布后,将防渗土工布的两端分别卷绕固定在至少一根连接块上,然后将连接块分别卡设连接于对应侧侧石后戗混凝土内埋设的挂钩另一端,侧石后戗混凝土终凝后完成防渗土工布的固定。本申请提供的分隔带内防渗土工布固定方法能够稳定的固定防渗土工布,并有效的防止固定的防渗土工布下滑时产生撕裂损坏。
Method for fixing anti-seepage geotextile in separation strip
The invention discloses a method for fixing anti-seepage geotextile in a separation strip, and relates to the field of road construction. The method for fixing the anti-seepage geotechnical cloth in the separation strip comprises the following steps that before curbstone rear berm concrete on the two sides of the separation strip is finally set, one ends of a plurality of hooks are pre-embedded into the curbstone rear berm concrete on the two sides at intervals; after anti-seepage geotechnical cloth is laid in the separation strip, the two ends of the anti-seepage geotechnical cloth are wound and fixed to at least one connecting block respectively, then the connecting blocks are connected to the other ends of the hooks embedded in the curbstone rear prop concrete on the corresponding sides in a clamped mode respectively, and fixing of the anti-seepage geotechnical cloth is completed after the curbstone rear prop concrete is finally set. According to the method for fixing the anti-seepage geotechnical cloth in the separation strip, the anti-seepage geotechnical cloth can be stably fixed, and the fixed anti-seepage geotechnical cloth is effectively prevented from being torn and damaged when sliding down.
一种分隔带内防渗土工布固定方法,涉及道路施工领域。该分隔带内防渗土工布固定方法包括以下步骤:在分隔带两侧的侧石后戗混凝土终凝前,将多个挂钩的一端间隔预埋至两侧的侧石后戗混凝土内;在分隔带内铺设防渗土工布后,将防渗土工布的两端分别卷绕固定在至少一根连接块上,然后将连接块分别卡设连接于对应侧侧石后戗混凝土内埋设的挂钩另一端,侧石后戗混凝土终凝后完成防渗土工布的固定。本申请提供的分隔带内防渗土工布固定方法能够稳定的固定防渗土工布,并有效的防止固定的防渗土工布下滑时产生撕裂损坏。
Method for fixing anti-seepage geotextile in separation strip
一种分隔带内防渗土工布固定方法
WU YUNLIANG (author) / DI HAO (author)
2022-08-02
Patent
Electronic Resource
Chinese
IPC:
E02D
FOUNDATIONS
,
Gründungen
Macromolecular environment-friendly composite anti-seepage geotextile and preparation method thereof
European Patent Office | 2023
|Post-cast strip anti-seepage structure and construction method
European Patent Office | 2024
|Anti-seepage soil post-cast strip and construction method thereof
European Patent Office | 2022
|