A platform for research: civil engineering, architecture and urbanism
Novel base layer paving elevation control device
The novel base layer paving elevation control device comprises a steel chisel, an adjusting assembly is arranged on the outer surface of the steel chisel, and a stabilizing assembly is arranged at the bottom end of the steel chisel; the adjusting assembly comprises a sleeve in sliding connection with the outer surface of the steel chisel, the outer surface of the sleeve is fixedly connected with a first nut, the inner side of the first nut is in threaded connection with a first bolt, and the end, away from the first nut, of the outer surface of the sleeve is fixedly connected with a horizontal rod; the end, away from the sleeve, of the horizontal rod is fixedly connected with a second nut, the inner side of the second nut is in threaded connection with a second bolt, and the top end of the second bolt is rotationally connected with a top plate. According to the novel base layer paving elevation control device, the adjusting assembly is arranged on the outer surface of the steel chisel, the adjusting assembly can conduct coarse leveling and fine leveling, the adjusting precision is improved, meanwhile, adjustment can be conducted in the paving process of the paver, operation is easy, precision is high, and use is convenient.
本发明涉及一种新型基层摊铺高程控制装置,包括钢钎,所述钢钎的外表面设有调节组件,所述钢钎的底端设有稳定组件;所述调节组件包括与钢钎外表面滑动连接的套筒,所述套筒的外表面固定连接有第一螺母,所述第一螺母的内侧螺纹连接有第一螺栓,所述套筒外表面远离第一螺母的一端固定连接有水平杆,所述水平杆远离套筒的一端固定连接有第二螺母,所述第二螺母的内侧螺纹连接有第二螺栓,所述第二螺栓的顶端转动连接有顶板。该新型基层摊铺高程控制装置,通过在钢钎外表面设有调节组件,调节组件可进行粗平和精平,提高调节精度,同时在摊铺机进行摊铺过程中也可进行调节,操作简单,精度高,使用方便。
Novel base layer paving elevation control device
The novel base layer paving elevation control device comprises a steel chisel, an adjusting assembly is arranged on the outer surface of the steel chisel, and a stabilizing assembly is arranged at the bottom end of the steel chisel; the adjusting assembly comprises a sleeve in sliding connection with the outer surface of the steel chisel, the outer surface of the sleeve is fixedly connected with a first nut, the inner side of the first nut is in threaded connection with a first bolt, and the end, away from the first nut, of the outer surface of the sleeve is fixedly connected with a horizontal rod; the end, away from the sleeve, of the horizontal rod is fixedly connected with a second nut, the inner side of the second nut is in threaded connection with a second bolt, and the top end of the second bolt is rotationally connected with a top plate. According to the novel base layer paving elevation control device, the adjusting assembly is arranged on the outer surface of the steel chisel, the adjusting assembly can conduct coarse leveling and fine leveling, the adjusting precision is improved, meanwhile, adjustment can be conducted in the paving process of the paver, operation is easy, precision is high, and use is convenient.
本发明涉及一种新型基层摊铺高程控制装置,包括钢钎,所述钢钎的外表面设有调节组件,所述钢钎的底端设有稳定组件;所述调节组件包括与钢钎外表面滑动连接的套筒,所述套筒的外表面固定连接有第一螺母,所述第一螺母的内侧螺纹连接有第一螺栓,所述套筒外表面远离第一螺母的一端固定连接有水平杆,所述水平杆远离套筒的一端固定连接有第二螺母,所述第二螺母的内侧螺纹连接有第二螺栓,所述第二螺栓的顶端转动连接有顶板。该新型基层摊铺高程控制装置,通过在钢钎外表面设有调节组件,调节组件可进行粗平和精平,提高调节精度,同时在摊铺机进行摊铺过程中也可进行调节,操作简单,精度高,使用方便。
Novel base layer paving elevation control device
一种新型基层摊铺高程控制装置
WANG XIAOLONG (author) / LIU JUNCHENG (author) / SONG YIXIN (author) / LI MENG (author) / ZHANG XIHE (author) / FANG XIAOLIANG (author) / ZHU CHANGBIAO (author)
2022-08-05
Patent
Electronic Resource
Chinese
IPC:
E01C
Bau von Straßen, Sportplätzen oder dgl., Decken dafür
,
CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE
Anti-rut pavement paving method capable of continuously paving base layer and surface layer
European Patent Office | 2020
|Positioner, control device and control method of asphalt paving elevation control guide rail
European Patent Office | 2024
|