A platform for research: civil engineering, architecture and urbanism
Dual-purpose jacking and driving equipment for inclined piles and straight piles
The invention relates to the technical field of pile foundation construction equipment, and discloses inclined and straight pile dual-purpose top driving equipment which comprises a rack and a folding type vertical frame, one side of the folding type vertical frame is connected with the rack through an angle adjusting mechanism, and the side, away from the angle adjusting mechanism, of the folding type vertical frame is fixedly provided with a pile driving mechanism and a reinforcement cage inserting mechanism through a drilling tool rail and a cage inserting rail. The piling mechanism comprises a drill rod power head, a long screw drill rod and a drill rod bearing and limiting mechanism, and the reinforcement cage inserting mechanism comprises an inserting and conveying rod pipe, a vibratory hammer and a roller type bracket. The construction angle adjustment of the piling mechanism and the drilling mechanism mounted on the folding vertical frame is realized through the matching of the hinged support and the angle adjusting mechanism, and the force supplementation of a long screw drill rod and an inserted rod pipe in the construction process is effectively realized through the drill rod mechanism and the cage inserting mechanism; the designed insertion elevation and depth are met, and inclined and vertical pressurization is carried out on a drill rod, a power head, a steel cage inserter and a vibratory hammer, so that drilling and steel cage insertion strength and speed are ensured.
本发明涉及桩基施工设备技术领域,公开了一种斜直桩两用顶打设备,包括机架和折叠式立架,折叠式立架一侧通过角度调节机构连接机架,折叠式立架远离角度调节机构的一侧通过钻具轨道、插笼轨道分别固定打桩机构、钢筋笼插笼机构,打桩机构包括钻杆动力头、长螺钻杆、钻杆承托限位机构,钢筋笼插笼机构包括插送棒管、振动锤、滚轮式托架。本发明通过铰式支座与角度调节机构的配合实现折叠式立架上安装的打桩机构和钻孔机构施工角度调整,通过钻杆机构、插笼机构有效实现了在施工过程中给长螺钻杆、插送棒管进行力的补充,满足设计的插入标高与深度以及对钻杆及动力头、钢笼插入器及振动锤进行斜、竖向加压,以确保钻进及钢笼插入力度与速度。
Dual-purpose jacking and driving equipment for inclined piles and straight piles
The invention relates to the technical field of pile foundation construction equipment, and discloses inclined and straight pile dual-purpose top driving equipment which comprises a rack and a folding type vertical frame, one side of the folding type vertical frame is connected with the rack through an angle adjusting mechanism, and the side, away from the angle adjusting mechanism, of the folding type vertical frame is fixedly provided with a pile driving mechanism and a reinforcement cage inserting mechanism through a drilling tool rail and a cage inserting rail. The piling mechanism comprises a drill rod power head, a long screw drill rod and a drill rod bearing and limiting mechanism, and the reinforcement cage inserting mechanism comprises an inserting and conveying rod pipe, a vibratory hammer and a roller type bracket. The construction angle adjustment of the piling mechanism and the drilling mechanism mounted on the folding vertical frame is realized through the matching of the hinged support and the angle adjusting mechanism, and the force supplementation of a long screw drill rod and an inserted rod pipe in the construction process is effectively realized through the drill rod mechanism and the cage inserting mechanism; the designed insertion elevation and depth are met, and inclined and vertical pressurization is carried out on a drill rod, a power head, a steel cage inserter and a vibratory hammer, so that drilling and steel cage insertion strength and speed are ensured.
本发明涉及桩基施工设备技术领域,公开了一种斜直桩两用顶打设备,包括机架和折叠式立架,折叠式立架一侧通过角度调节机构连接机架,折叠式立架远离角度调节机构的一侧通过钻具轨道、插笼轨道分别固定打桩机构、钢筋笼插笼机构,打桩机构包括钻杆动力头、长螺钻杆、钻杆承托限位机构,钢筋笼插笼机构包括插送棒管、振动锤、滚轮式托架。本发明通过铰式支座与角度调节机构的配合实现折叠式立架上安装的打桩机构和钻孔机构施工角度调整,通过钻杆机构、插笼机构有效实现了在施工过程中给长螺钻杆、插送棒管进行力的补充,满足设计的插入标高与深度以及对钻杆及动力头、钢笼插入器及振动锤进行斜、竖向加压,以确保钻进及钢笼插入力度与速度。
Dual-purpose jacking and driving equipment for inclined piles and straight piles
一种斜直桩两用顶打设备
LIU XIANGANG (author) / XIONG XIAOLIN (author) / LIU BIN (author)
2022-08-05
Patent
Electronic Resource
Chinese
Soil resistance when jacking piles
Online Contents | 1966
|Vertical Piles Versus Inclined/Battered/Raked Piles
Springer Verlag | 2017
|Inclined-straight alternating group piles-soil-structure interaction experiment model
European Patent Office | 2015
|Deformational behaviour of steel sheet piles during jacking
British Library Online Contents | 2018
|