A platform for research: civil engineering, architecture and urbanism
The invention discloses an indoor decoration ground waterproof layer brushing construction process which comprises the following steps: S1, before waterproof layer construction, dust and other sundries on the surface of a base layer are cleaned up, and clean wet cloth is used for wiping once, S2, primer is evenly brushed on the surface of the base layer through a long-handle rolling brush, after coating is conducted for 4 h at the normal temperature, when the hand feeling is not sticky, the next working procedure can be conducted, and after coating, the next working procedure is conducted. S3, the surface of the base layer coated with the primer is evenly coated with a waterproof material through a plastic or rubber scraper blade, the using amount of the waterproof material per square meter is 0.8 kg, the defects of missing brushing, bubbling and the like do not exist, the waterproof material is air-dried and cured for 24 h, and S4, on the coating cured in the S3, the surface of the coating is evenly coated with a second coating in the direction perpendicular to the first coating. According to the indoor decoration ground waterproof layer brushing construction technology, multiple coatings are evenly brushed, and brushing is conducted alternately in the transverse direction and the longitudinal direction, so that no bubble is left between base layers, the waterproof effect is good, and all-around waterproof protection can be achieved.
本发明公开了一种室内装修地面防水层涂刷施工工艺,包括以下步骤:S1:防水层施工前,应将基层表面的尘土等杂物清除干净,并用干净的湿布擦一次,S2:用长把滚刷均匀的将底胶涂刷在基层表面,涂后常温季节4h以后,手感不粘时,即可做下道工序,S3:将防水材料,用塑料或橡皮刮板均匀涂刮在已涂好底胶的基层表面,每平方米用量为0.8kg,不得有漏刷和鼓泡等缺陷,晾干待24h固化,S4:在S3已固化的涂层上,第二道涂层采用与第一道涂层相互垂直的方向均匀涂刷在涂层表面。该室内装修地面防水层涂刷施工工艺,通过均匀的涂刷多道涂层,并且横纵交替涂刷,使得基层之间不留气泡,使得防水效果好,可以做到全方位的防水保护。
The invention discloses an indoor decoration ground waterproof layer brushing construction process which comprises the following steps: S1, before waterproof layer construction, dust and other sundries on the surface of a base layer are cleaned up, and clean wet cloth is used for wiping once, S2, primer is evenly brushed on the surface of the base layer through a long-handle rolling brush, after coating is conducted for 4 h at the normal temperature, when the hand feeling is not sticky, the next working procedure can be conducted, and after coating, the next working procedure is conducted. S3, the surface of the base layer coated with the primer is evenly coated with a waterproof material through a plastic or rubber scraper blade, the using amount of the waterproof material per square meter is 0.8 kg, the defects of missing brushing, bubbling and the like do not exist, the waterproof material is air-dried and cured for 24 h, and S4, on the coating cured in the S3, the surface of the coating is evenly coated with a second coating in the direction perpendicular to the first coating. According to the indoor decoration ground waterproof layer brushing construction technology, multiple coatings are evenly brushed, and brushing is conducted alternately in the transverse direction and the longitudinal direction, so that no bubble is left between base layers, the waterproof effect is good, and all-around waterproof protection can be achieved.
本发明公开了一种室内装修地面防水层涂刷施工工艺,包括以下步骤:S1:防水层施工前,应将基层表面的尘土等杂物清除干净,并用干净的湿布擦一次,S2:用长把滚刷均匀的将底胶涂刷在基层表面,涂后常温季节4h以后,手感不粘时,即可做下道工序,S3:将防水材料,用塑料或橡皮刮板均匀涂刮在已涂好底胶的基层表面,每平方米用量为0.8kg,不得有漏刷和鼓泡等缺陷,晾干待24h固化,S4:在S3已固化的涂层上,第二道涂层采用与第一道涂层相互垂直的方向均匀涂刷在涂层表面。该室内装修地面防水层涂刷施工工艺,通过均匀的涂刷多道涂层,并且横纵交替涂刷,使得基层之间不留气泡,使得防水效果好,可以做到全方位的防水保护。
Indoor decoration ground waterproof layer brushing construction technology
一种室内装修地面防水层涂刷施工工艺
2022-08-12
Patent
Electronic Resource
Chinese
Building indoor decoration top surface waterproof layer brushing construction technology
European Patent Office | 2024
|Painting construction process of building indoor decoration ground waterproof layer
European Patent Office | 2020
|Indoor decoration ground waterproof layer coating device for building
European Patent Office | 2023
|