A platform for research: civil engineering, architecture and urbanism
Plugging device for concrete wall and column through-wall bolt hole
The invention belongs to the technical field of constructional engineering, and particularly relates to a concrete wall and column through-wall bolt hole plugging device which comprises a concrete wall and a galvanized iron sheet located on one side of the concrete wall, a through-wall bolt hole is formed in one side of the concrete wall, a hole opening is formed in the center of one side of the galvanized iron sheet, and the hole opening corresponds to the through-wall bolt hole. And the hole is matched with the through-wall bolt hole in size. According to the construction method, in the final stage of traditional hole plugging construction, a galvanized iron sheet round hole mold with the thickness of 0.3 mm is adopted for conducting mortar pressing and smearing on the surface of a concrete wall and column through-wall bolt hole, finally, hole plugging mortar looks like a standard-size round pattern and survives at a time, and the construction quality and the construction efficiency of through-wall bolt hole plugging are greatly improved.
本发明属于建筑工程技术领域,尤其是一种砼墙、柱穿墙螺栓孔洞封堵装置,包括砼墙和位于砼墙一侧的镀锌铁皮,所述砼墙的一侧开设有穿墙螺栓孔洞,所述镀锌铁皮的一侧中心位置开设有洞口,洞口与穿墙螺栓孔洞相对应设置,且洞口与穿墙螺栓孔洞大小相适配。本发明在传统洞口封堵施工的最后阶段,采用0.3mm厚镀锌铁皮圆孔模具,对砼墙、柱穿墙螺栓洞口表面进行砂浆压抹,最终洞口封堵砂浆观感为标准尺寸圆形图案,且一次成活,大大的提高了穿墙螺栓洞口封堵的施工质量和施工效率。
Plugging device for concrete wall and column through-wall bolt hole
The invention belongs to the technical field of constructional engineering, and particularly relates to a concrete wall and column through-wall bolt hole plugging device which comprises a concrete wall and a galvanized iron sheet located on one side of the concrete wall, a through-wall bolt hole is formed in one side of the concrete wall, a hole opening is formed in the center of one side of the galvanized iron sheet, and the hole opening corresponds to the through-wall bolt hole. And the hole is matched with the through-wall bolt hole in size. According to the construction method, in the final stage of traditional hole plugging construction, a galvanized iron sheet round hole mold with the thickness of 0.3 mm is adopted for conducting mortar pressing and smearing on the surface of a concrete wall and column through-wall bolt hole, finally, hole plugging mortar looks like a standard-size round pattern and survives at a time, and the construction quality and the construction efficiency of through-wall bolt hole plugging are greatly improved.
本发明属于建筑工程技术领域,尤其是一种砼墙、柱穿墙螺栓孔洞封堵装置,包括砼墙和位于砼墙一侧的镀锌铁皮,所述砼墙的一侧开设有穿墙螺栓孔洞,所述镀锌铁皮的一侧中心位置开设有洞口,洞口与穿墙螺栓孔洞相对应设置,且洞口与穿墙螺栓孔洞大小相适配。本发明在传统洞口封堵施工的最后阶段,采用0.3mm厚镀锌铁皮圆孔模具,对砼墙、柱穿墙螺栓洞口表面进行砂浆压抹,最终洞口封堵砂浆观感为标准尺寸圆形图案,且一次成活,大大的提高了穿墙螺栓洞口封堵的施工质量和施工效率。
Plugging device for concrete wall and column through-wall bolt hole
一种砼墙、柱穿墙螺栓孔洞封堵装置
YU DONGJIE (author) / GUO LINHUA (author) / SUN RUI (author) / YANG SHAOFEI (author) / WU SHAORONG (author) / LI BING (author) / SUN YINGYING (author) / HAO WENJUN (author) / YU DONGDONG (author) / E PENGKUN (author)
2022-08-16
Patent
Electronic Resource
Chinese
IPC:
E04G
SCAFFOLDING
,
Baugerüste
Assembling kit for plugging concrete outer wall bolt hole
European Patent Office | 2021
|