A platform for research: civil engineering, architecture and urbanism
Double-layer ALC plate outer wall external hanging installation method
The invention relates to a double-layer ALC board outer wall external hanging installation method. An L-shaped connecting piece and a T-shaped connecting piece are connected with structures of the upper portion and the lower portion of a building correspondingly. The inner side ALC plate and the outer side ALC plate are fixed between the L-shaped connecting piece and the T-shaped connecting piece; the first U-shaped fixing piece is arranged at the top of a gap between the inner side ALC plate and the outer side ALC plate and is connected with the L-shaped connecting piece; the second U-shaped fixing piece is arranged at the bottom of the gap between the inner side ALC plate and the outer side ALC plate and connected with the T-shaped connecting piece. After installation is completed, bonding mortar is laid in a gap between the inner side ALC plate and the outer side ALC plate, a prefabricated inverted-T-shaped concrete block is placed on the top of the gap, and the bottom of the inner side ALC plate is fixed to the structure of the lower portion of a building through angle steel and bolts. The device is fixed with a structure through the connecting piece; the ALC plate is fixed to the connecting piece through the first U-shaped fixing piece and the second U-shaped fixing piece, construction is easy, and the construction efficiency can be improved.
本发明涉及一种双层ALC板外墙外挂安装方法,L型连接件和T型连接件分别与建筑物上部和下部的结构相连接;内侧ALC板与外侧ALC板固定于L型连接件和T型连接件之间;第一U型固定件设置在内侧ALC板和外侧ALC板中间间隙的顶部并与L型连接件相连;第二U型固定件设置在内侧ALC板和外侧ALC板中间间隙的底部并与T型连接件相连。安装完成后,在内侧ALC板和外侧ALC板的中间缝隙铺粘接砂浆,中间缝隙顶部放置预制好的“凸”型混凝土块,内侧ALC板材底部采用角钢和螺栓与建筑物下部的结构固定。本发明通过连接件与结构进行固定;ALC板通过第一U型固定件和第二U型固定件与连接件固定,施工简单、可提高施工效率。
Double-layer ALC plate outer wall external hanging installation method
The invention relates to a double-layer ALC board outer wall external hanging installation method. An L-shaped connecting piece and a T-shaped connecting piece are connected with structures of the upper portion and the lower portion of a building correspondingly. The inner side ALC plate and the outer side ALC plate are fixed between the L-shaped connecting piece and the T-shaped connecting piece; the first U-shaped fixing piece is arranged at the top of a gap between the inner side ALC plate and the outer side ALC plate and is connected with the L-shaped connecting piece; the second U-shaped fixing piece is arranged at the bottom of the gap between the inner side ALC plate and the outer side ALC plate and connected with the T-shaped connecting piece. After installation is completed, bonding mortar is laid in a gap between the inner side ALC plate and the outer side ALC plate, a prefabricated inverted-T-shaped concrete block is placed on the top of the gap, and the bottom of the inner side ALC plate is fixed to the structure of the lower portion of a building through angle steel and bolts. The device is fixed with a structure through the connecting piece; the ALC plate is fixed to the connecting piece through the first U-shaped fixing piece and the second U-shaped fixing piece, construction is easy, and the construction efficiency can be improved.
本发明涉及一种双层ALC板外墙外挂安装方法,L型连接件和T型连接件分别与建筑物上部和下部的结构相连接;内侧ALC板与外侧ALC板固定于L型连接件和T型连接件之间;第一U型固定件设置在内侧ALC板和外侧ALC板中间间隙的顶部并与L型连接件相连;第二U型固定件设置在内侧ALC板和外侧ALC板中间间隙的底部并与T型连接件相连。安装完成后,在内侧ALC板和外侧ALC板的中间缝隙铺粘接砂浆,中间缝隙顶部放置预制好的“凸”型混凝土块,内侧ALC板材底部采用角钢和螺栓与建筑物下部的结构固定。本发明通过连接件与结构进行固定;ALC板通过第一U型固定件和第二U型固定件与连接件固定,施工简单、可提高施工效率。
Double-layer ALC plate outer wall external hanging installation method
双层ALC板外墙外挂安装方法
SU YONGTING (author) / DU HAIPENG (author) / LIU JIANDONG (author) / LI ZHONGWANG (author) / YANG SHUPING (author) / ZUO MING (author) / SHANG SHULI (author) / HAO XIAOFEI (author) / JIAO YONG (author) / LIANG SHILEI (author)
2022-08-23
Patent
Electronic Resource
Chinese
IPC:
E04F
FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
,
Ausbau von Bauwerken, z.B. Treppen, Fußböden
Three-dimensional multi-layer outer wall hanging basket installation and construction technology
European Patent Office | 2023
|Wall hanging plate installation structure and installation method thereof
European Patent Office | 2015
|