Novel formwork erecting method for gutter in pitched roof house
A novel formwork erecting method for a gutter in a pitched roof house is characterized by comprising the following steps of a, completing steel bar binding of a gutter bottom plate and a side plate, b, formwork erecting of the side wall of the gutter, c, formwork erecting of the gutter bottom plate, d, fixing a mold in the design width direction of the gutter through a plurality of water stop bolts, e, pouring concrete, dismantling the mold, and e, conducting formwork erecting. And f, recycling the gutter finished product mold at the rest gutter parts. The novel formwork erecting method for the gutter in the pitched roof house has the advantages that the gutter is machined through the finished aluminum mold, the adverse effect caused by traditional suspended formwork erecting can be well avoided, the engineering quality is safe and reliable, the construction progress is fast, the mold is repeatedly used, and the engineering cost is reduced.
一种坡屋面房屋中天沟的新型支模方法,其特征在于包括以下步骤:a、完成天沟底板和侧板的钢筋绑扎,b、天沟的侧壁支模,c、天沟的底板支模,d、用若干止水螺栓在天沟设计宽度方向上将模具固定,e、浇筑混凝土,拆除模具,f、天沟成品模具在其余天沟部位的重复利用。本发明的坡屋面房屋中天沟的新型支模方法具有采用成品铝制模具加工而成,能够较好的避免传统支设吊模带来的不利影响,工程质量安全可靠、施工进度快,实现重复利用模具和降低工程成本的优点。
Novel formwork erecting method for gutter in pitched roof house
A novel formwork erecting method for a gutter in a pitched roof house is characterized by comprising the following steps of a, completing steel bar binding of a gutter bottom plate and a side plate, b, formwork erecting of the side wall of the gutter, c, formwork erecting of the gutter bottom plate, d, fixing a mold in the design width direction of the gutter through a plurality of water stop bolts, e, pouring concrete, dismantling the mold, and e, conducting formwork erecting. And f, recycling the gutter finished product mold at the rest gutter parts. The novel formwork erecting method for the gutter in the pitched roof house has the advantages that the gutter is machined through the finished aluminum mold, the adverse effect caused by traditional suspended formwork erecting can be well avoided, the engineering quality is safe and reliable, the construction progress is fast, the mold is repeatedly used, and the engineering cost is reduced.
一种坡屋面房屋中天沟的新型支模方法,其特征在于包括以下步骤:a、完成天沟底板和侧板的钢筋绑扎,b、天沟的侧壁支模,c、天沟的底板支模,d、用若干止水螺栓在天沟设计宽度方向上将模具固定,e、浇筑混凝土,拆除模具,f、天沟成品模具在其余天沟部位的重复利用。本发明的坡屋面房屋中天沟的新型支模方法具有采用成品铝制模具加工而成,能够较好的避免传统支设吊模带来的不利影响,工程质量安全可靠、施工进度快,实现重复利用模具和降低工程成本的优点。
Novel formwork erecting method for gutter in pitched roof house
坡屋面房屋中天沟的新型支模方法
CHEN JINGYU (author) / HUANG FEIXIANG (author)
2022-08-23
Patent
Electronic Resource
Chinese
Formwork-free assembly type eave gutter retaining wall for industrial pitched roof
European Patent Office | 2024
|Roof member with gutter and pitched roof with roof member
European Patent Office | 2023
|Formwork-erecting-free system construction method for irregular concrete gutter
European Patent Office | 2021
|