Construction method of circular concrete module inspection well
A construction method of a round concrete module inspection well is characterized by comprising the following steps of a, base layer cleaning and cushion layer pouring, b, module brick building, c, horizontal groove rib installation, d, step installation, e, connecting pipe connection and f, joint rib hole filling, it is ensured that concrete in a filling hole is compact, and a top layer module filling core needs to be poured to be flush with the upper edge of the top face. The construction method of the circular concrete module inspection well has the advantages that the overall stability and the overall strength of the wall are improved, the construction speed is high, the shear resistance is high, the construction method is simple and flexible in process, environment-friendly, energy-saving and attractive in forming, clay products are abandoned, the environmental protection policy is implemented, and the construction method has far-reaching social benefits and economic benefits.
一种圆形混凝土模块检查井的施工方法,其特征在于包括以下步骤:a、清理基层、浇筑垫层,b、模块砖砌筑,c、卧槽筋安装,d、踏步安装,e、连接管接入,f、插筋灌孔,确保灌孔混凝土密实,使顶层模块灌芯应浇至与顶面上沿齐平。本发明的圆形混凝土模块检查井的施工方法具有提高墙体的整体稳定性和整体强度,而且施工速度快、抗剪能力强,施工方法工艺简单、灵活,环保节能,成型美观,摒弃黏土制品、落实环境保护政策有着深远的社会效益和经济效益的优点。
Construction method of circular concrete module inspection well
A construction method of a round concrete module inspection well is characterized by comprising the following steps of a, base layer cleaning and cushion layer pouring, b, module brick building, c, horizontal groove rib installation, d, step installation, e, connecting pipe connection and f, joint rib hole filling, it is ensured that concrete in a filling hole is compact, and a top layer module filling core needs to be poured to be flush with the upper edge of the top face. The construction method of the circular concrete module inspection well has the advantages that the overall stability and the overall strength of the wall are improved, the construction speed is high, the shear resistance is high, the construction method is simple and flexible in process, environment-friendly, energy-saving and attractive in forming, clay products are abandoned, the environmental protection policy is implemented, and the construction method has far-reaching social benefits and economic benefits.
一种圆形混凝土模块检查井的施工方法,其特征在于包括以下步骤:a、清理基层、浇筑垫层,b、模块砖砌筑,c、卧槽筋安装,d、踏步安装,e、连接管接入,f、插筋灌孔,确保灌孔混凝土密实,使顶层模块灌芯应浇至与顶面上沿齐平。本发明的圆形混凝土模块检查井的施工方法具有提高墙体的整体稳定性和整体强度,而且施工速度快、抗剪能力强,施工方法工艺简单、灵活,环保节能,成型美观,摒弃黏土制品、落实环境保护政策有着深远的社会效益和经济效益的优点。
Construction method of circular concrete module inspection well
一种圆形混凝土模块检查井的施工方法
ZHAO PENGFEI (author)
2022-08-26
Patent
Electronic Resource
Chinese
Construction method of concrete module brick inspection well
European Patent Office | 2022
|Concrete module type drainage inspection well anti-seepage construction method
European Patent Office | 2022
|Construction method of circular inspection well formwork
European Patent Office | 2021
|Reinforcing structure for circular inspection well construction
European Patent Office | 2024
|