A platform for research: civil engineering, architecture and urbanism
Water stop steel plate corner part fine welding control and construction method
The invention discloses a water-stop steel plate corner fine welding control and a construction method, the water-stop steel plate corner fine welding control comprises an angle steel assembly, a water-stop steel plate strip and a clamp, the angle steel assembly is formed by welding angle steel I and angle steel II, and the water-stop steel plate corner is clamped and positioned through the clamp during welding. The method has the beneficial effects that sealing and welding are tight, the hidden danger of leakage is eliminated, meanwhile, burning, welding skipping or welding penetration of the water stop steel plate is prevented, the waterproof performance of the basement outer wall construction joint is met, and the common problems that vertical right-angle welding seams and T-shaped fillet welding seams are difficult to weld and poor in welding quality in the traditional process, especially the splayed corner part of the water stop steel plate are effectively solved.
本发明公开了一种止水钢板转角部位精焊控件及施工方法,包括角钢组件、止水钢板条和夹具,所述角钢组件由角钢一和角钢二通过焊接组成,所述止水钢板转角焊接时通过夹具夹持定位。本发明的有益效果为:封焊严密,消除渗漏隐患,同时防止了止水钢板烧伤、漏焊或焊穿,满足地下室外墙施工缝防水性能,有效解决了传统工艺竖向直角焊缝及T型角焊缝施焊困难、焊接质量差的通病,尤其是止水钢板八字角部位。
Water stop steel plate corner part fine welding control and construction method
The invention discloses a water-stop steel plate corner fine welding control and a construction method, the water-stop steel plate corner fine welding control comprises an angle steel assembly, a water-stop steel plate strip and a clamp, the angle steel assembly is formed by welding angle steel I and angle steel II, and the water-stop steel plate corner is clamped and positioned through the clamp during welding. The method has the beneficial effects that sealing and welding are tight, the hidden danger of leakage is eliminated, meanwhile, burning, welding skipping or welding penetration of the water stop steel plate is prevented, the waterproof performance of the basement outer wall construction joint is met, and the common problems that vertical right-angle welding seams and T-shaped fillet welding seams are difficult to weld and poor in welding quality in the traditional process, especially the splayed corner part of the water stop steel plate are effectively solved.
本发明公开了一种止水钢板转角部位精焊控件及施工方法,包括角钢组件、止水钢板条和夹具,所述角钢组件由角钢一和角钢二通过焊接组成,所述止水钢板转角焊接时通过夹具夹持定位。本发明的有益效果为:封焊严密,消除渗漏隐患,同时防止了止水钢板烧伤、漏焊或焊穿,满足地下室外墙施工缝防水性能,有效解决了传统工艺竖向直角焊缝及T型角焊缝施焊困难、焊接质量差的通病,尤其是止水钢板八字角部位。
Water stop steel plate corner part fine welding control and construction method
一种止水钢板转角部位精焊控件及施工方法
LIANG HUAIGANG (author) / WANG ZHIYONG (author) / LIU QIANG (author) / ZHAO ZHONGHUA (author) / CAI JIANZHEN (author) / LIU XI (author) / SONG MIAO (author) / YANG GUANGPENG (author) / LI PINGANG (author) / FAN JIANWEI (author)
2022-08-30
Patent
Electronic Resource
Chinese
Welding type steel plate pile corner water stopping construction method
European Patent Office | 2020
|Welding-free water stop steel plate connecting structure
European Patent Office | 2022
|