Construction method for hoisting stage mechanical equipment
The invention relates to the field of building hoisting, in particular to a stage mechanical equipment hoisting construction method which comprises the following steps: S1, preparation before hoisting construction; s2, a transportation channel is arranged, and large components needing to be hoisted are transported conveniently; s3, hoisting equipment is selected, the appropriate hoisting equipment is selected according to the actual situation of a project and site conditions, an initial hoisting scheme is determined, and the hoisting equipment comprises transportation equipment for transporting large components to a construction site, hoisting equipment for hoisting the components and related auxiliary equipment; the hoisting equipment comprises a plurality of hoisting winches and a plurality of pulley blocks, and components are hoisted through the combination of the hoisting winches and the pulley blocks; s4, hoisting equipment is arranged, and transportation equipment, hoisting equipment and related auxiliary equipment are arranged to proper positions according to actual conditions on site; and S5, starting hoisting. The lifting device has the effect that it is guaranteed that the convenience of lifting heavy and heavy equipment is improved in a limited space.
本申请涉及建筑吊装的领域,尤其是涉及一种舞台机械设备吊装的施工方法,其包括以下步骤:S1:吊装施工前准备;S2:设置运输通道,方便运输需要吊装的大型构件;S3:选取吊装设备,根据工程的实际情况和场地条件选取合适的吊装设备以及确定初始的吊装方案,所述吊装设备包括将大型构件运输到施工现场的运输设备、吊装构件的起重设备和相关辅助设备,所述起重设备包括多个起重卷扬机和多个滑轮组,通过起重卷扬机和滑轮组的组合对构件进行吊装;S4:布置吊装设备,根据现场的实际条件,将运输设备、起重设备和相关辅助设备布置到合适的位置;S5:开始吊装。本申请具有保证在有限空间内,提高吊装重大型设备便捷性的效果。
Construction method for hoisting stage mechanical equipment
The invention relates to the field of building hoisting, in particular to a stage mechanical equipment hoisting construction method which comprises the following steps: S1, preparation before hoisting construction; s2, a transportation channel is arranged, and large components needing to be hoisted are transported conveniently; s3, hoisting equipment is selected, the appropriate hoisting equipment is selected according to the actual situation of a project and site conditions, an initial hoisting scheme is determined, and the hoisting equipment comprises transportation equipment for transporting large components to a construction site, hoisting equipment for hoisting the components and related auxiliary equipment; the hoisting equipment comprises a plurality of hoisting winches and a plurality of pulley blocks, and components are hoisted through the combination of the hoisting winches and the pulley blocks; s4, hoisting equipment is arranged, and transportation equipment, hoisting equipment and related auxiliary equipment are arranged to proper positions according to actual conditions on site; and S5, starting hoisting. The lifting device has the effect that it is guaranteed that the convenience of lifting heavy and heavy equipment is improved in a limited space.
本申请涉及建筑吊装的领域,尤其是涉及一种舞台机械设备吊装的施工方法,其包括以下步骤:S1:吊装施工前准备;S2:设置运输通道,方便运输需要吊装的大型构件;S3:选取吊装设备,根据工程的实际情况和场地条件选取合适的吊装设备以及确定初始的吊装方案,所述吊装设备包括将大型构件运输到施工现场的运输设备、吊装构件的起重设备和相关辅助设备,所述起重设备包括多个起重卷扬机和多个滑轮组,通过起重卷扬机和滑轮组的组合对构件进行吊装;S4:布置吊装设备,根据现场的实际条件,将运输设备、起重设备和相关辅助设备布置到合适的位置;S5:开始吊装。本申请具有保证在有限空间内,提高吊装重大型设备便捷性的效果。
Construction method for hoisting stage mechanical equipment
一种舞台机械设备吊装的施工方法
GAO QIAN (author) / GUO JINSONG (author) / LIU JIAYIN (author) / LIU MINGHUI (author) / WANG CHENGCAI (author) / LIU XUE (author) / SUN YUSHEN (author) / EBISUCHI (author) / ZHENG XIAOLEI (author) / WU WEI (author)
2022-09-02
Patent
Electronic Resource
Chinese