A platform for research: civil engineering, architecture and urbanism
Double shear wall formwork supporting structure and construction method thereof
The invention discloses a double-shear-wall formwork supporting structure. Main keels and auxiliary keels are arranged in shear walls. The templates comprise templates arranged on the top surface, the outer wall surface and the inner wall surface of the double shear wall; the formworks on the outer wall face and the inner wall face of the double shear wall, the secondary keels and the main keels are fixedly connected through split bolt assemblies. By the adoption of the technical scheme, the integrated formwork erecting method of the double shear walls and the whole structure is formed, the construction workload of the procedure is reduced, the previous formwork erecting technology is improved to a large extent, and the construction efficiency of the structure is improved; the construction safety is further improved, and a guarantee is provided for safe construction of constructors; in the construction process of a double shear wall structure of constructional engineering, by using the formwork supporting system, the formwork supporting strength of the structure can be effectively improved, quality control in the construction process is facilitated, and the quality of a shear wall after construction is completed is improved.
本发明公开了一种双重剪力墙模板支撑结构,剪力墙中设置主龙骨和次龙骨;模板包括设置在双重剪力墙顶面、外墙面和内墙面上的模板;在双重剪力墙的外墙面和内墙面上的模板、次龙骨和主龙骨之间,采用对拉螺栓组件进行固定连接。采用上述技术方案,形成双重剪力墙以及整个结构的一体化支模的方法,减少了该工序的施工工作量,较大程度上改进了以往的支模工艺,提升了该结构的施工效率;进一步提升了施工的安全性,对施工人员安全施工提供了保障;在建筑工程双重剪力墙结构的建造过程中,使用该模板支撑体系,可有效的提高了该结构的模板支撑强度,有利于施工过程中质量管控,提高了施工完成后的剪力墙的质量。
Double shear wall formwork supporting structure and construction method thereof
The invention discloses a double-shear-wall formwork supporting structure. Main keels and auxiliary keels are arranged in shear walls. The templates comprise templates arranged on the top surface, the outer wall surface and the inner wall surface of the double shear wall; the formworks on the outer wall face and the inner wall face of the double shear wall, the secondary keels and the main keels are fixedly connected through split bolt assemblies. By the adoption of the technical scheme, the integrated formwork erecting method of the double shear walls and the whole structure is formed, the construction workload of the procedure is reduced, the previous formwork erecting technology is improved to a large extent, and the construction efficiency of the structure is improved; the construction safety is further improved, and a guarantee is provided for safe construction of constructors; in the construction process of a double shear wall structure of constructional engineering, by using the formwork supporting system, the formwork supporting strength of the structure can be effectively improved, quality control in the construction process is facilitated, and the quality of a shear wall after construction is completed is improved.
本发明公开了一种双重剪力墙模板支撑结构,剪力墙中设置主龙骨和次龙骨;模板包括设置在双重剪力墙顶面、外墙面和内墙面上的模板;在双重剪力墙的外墙面和内墙面上的模板、次龙骨和主龙骨之间,采用对拉螺栓组件进行固定连接。采用上述技术方案,形成双重剪力墙以及整个结构的一体化支模的方法,减少了该工序的施工工作量,较大程度上改进了以往的支模工艺,提升了该结构的施工效率;进一步提升了施工的安全性,对施工人员安全施工提供了保障;在建筑工程双重剪力墙结构的建造过程中,使用该模板支撑体系,可有效的提高了该结构的模板支撑强度,有利于施工过程中质量管控,提高了施工完成后的剪力墙的质量。
Double shear wall formwork supporting structure and construction method thereof
一种双重剪力墙模板支撑结构及其施工方法
WANG YUKUN (author) / YU WENMING (author) / WANG CONGCONG (author) / LING FENG (author) / TIAN XIN (author)
2022-09-06
Patent
Electronic Resource
Chinese
IPC:
E04G
SCAFFOLDING
,
Baugerüste
Shear wall formwork supporting structure and construction method thereof
European Patent Office | 2023
|Deformation joint shear wall formwork structure and formwork supporting construction method
European Patent Office | 2024
|Shear wall formwork supporting structure and construction method
European Patent Office | 2021
|Shear wall formwork supporting structure and construction method
European Patent Office | 2021
|Shear wall forming formwork opposite-pulling supporting structure and construction method thereof
European Patent Office | 2024
|