A platform for research: civil engineering, architecture and urbanism
Formwork erecting construction method for horizontal construction joint of basement outer wall under single-side formwork erecting working condition
The invention discloses a formwork erecting construction method for a horizontal construction joint of a basement outer wall under the working condition of single-side formwork erecting. The formwork erecting construction method comprises the following steps that S1, the surface of a supporting structure is cleaned; s2, outer wall waterproofing and steel bar binding; s3, performing die forging customization on the shaped perforated steel; s4, outer wall large surface steel mold section installation; 5, connecting and mounting the shaped perforated steel die sections; 6, the screw rod is accurately positioned; s7, positioning and mounting a water stop steel plate; s8, first-time concrete pouring is conducted on the outer wall; according to the construction method, one-time formwork erecting of the horizontal construction joint is achieved, secondary formwork erecting can be conducted without replacing a wood formwork, the construction period can be effectively shortened, the construction efficiency is improved, meanwhile, the construction cost is reduced, and good application and popularization value is achieved.
本发明公开一种单边支模工况下地下室外墙水平施工缝支模施工方法,包括如下步骤:S1、支护结构表面清理;S2、外墙防水和钢筋绑扎;S3、定型化穿孔钢模锻定制;S4、外墙大面钢模段安装;5、定型化穿孔钢模段连接安装;6、螺杆精确定位;S7、止水钢板定位和安装;S8、外墙首次混凝土浇筑;S9、外墙钢模段拆除,本发明实现了水平施工缝的一次支模,无需更换木模进行二次支模,可以有效缩短施工工期,提高施工效率,同时缩减施工成本,具有良好的推广应用价值。
Formwork erecting construction method for horizontal construction joint of basement outer wall under single-side formwork erecting working condition
The invention discloses a formwork erecting construction method for a horizontal construction joint of a basement outer wall under the working condition of single-side formwork erecting. The formwork erecting construction method comprises the following steps that S1, the surface of a supporting structure is cleaned; s2, outer wall waterproofing and steel bar binding; s3, performing die forging customization on the shaped perforated steel; s4, outer wall large surface steel mold section installation; 5, connecting and mounting the shaped perforated steel die sections; 6, the screw rod is accurately positioned; s7, positioning and mounting a water stop steel plate; s8, first-time concrete pouring is conducted on the outer wall; according to the construction method, one-time formwork erecting of the horizontal construction joint is achieved, secondary formwork erecting can be conducted without replacing a wood formwork, the construction period can be effectively shortened, the construction efficiency is improved, meanwhile, the construction cost is reduced, and good application and popularization value is achieved.
本发明公开一种单边支模工况下地下室外墙水平施工缝支模施工方法,包括如下步骤:S1、支护结构表面清理;S2、外墙防水和钢筋绑扎;S3、定型化穿孔钢模锻定制;S4、外墙大面钢模段安装;5、定型化穿孔钢模段连接安装;6、螺杆精确定位;S7、止水钢板定位和安装;S8、外墙首次混凝土浇筑;S9、外墙钢模段拆除,本发明实现了水平施工缝的一次支模,无需更换木模进行二次支模,可以有效缩短施工工期,提高施工效率,同时缩减施工成本,具有良好的推广应用价值。
Formwork erecting construction method for horizontal construction joint of basement outer wall under single-side formwork erecting working condition
一种单边支模工况下地下室外墙水平施工缝支模施工方法
WU LONGEN (author) / XIAO HAN (author) / QUAN YOUWEI (author) / GU CHENCHEN (author) / TENG XIAOJUN (author) / XING CHENG (author) / LIU JIANG (author) / SUN YIMING (author)
2022-09-06
Patent
Electronic Resource
Chinese
Basement outer wall single-side formwork erecting construction tool and construction method
European Patent Office | 2024
|Basement outer wall single-side formwork erecting construction technology in narrow space
European Patent Office | 2023
|Wall single-side formwork erecting device and formwork erecting method
European Patent Office | 2022
|Basement outer wall single-face formwork erecting system and construction method thereof
European Patent Office | 2023
|Single-side formwork erecting construction device and construction method for outer wall
European Patent Office | 2021
|