A platform for research: civil engineering, architecture and urbanism
Steel structure mounting equipment for portal steel frame plant
The invention belongs to the field of steel structure installation, and particularly relates to door-type steel frame plant steel structure installation equipment which comprises a steel rail. The top surface of the steel rail is slidably connected with a base; extension devices are connected to the two sides of the base; one side of each of the two extension devices is fixedly connected with a pair of symmetrically arranged supporting rods; an insertion hole is formed in one end, far away from the extension device, of the supporting rod; the top surface of the base is fixedly connected with a supporting seat; the top surface of the supporting seat is fixedly connected with a winding roll; the side surface of the winding roll is fixedly connected with a cable, and the cable is firstly fixed to the top of the steel structure; then two supporting columns of the steel structure are fixed through inserting holes, at the moment, a worker starts a winding roll to pull up the steel structure, then the bottoms of the supporting columns are fixed to a foundation, then installation of the steel structure is completed, the steel structure is pulled up through a cable, later fixing of the worker is facilitated, the risk that the steel structure collapses during installation is reduced, and the construction efficiency is improved. And the life safety of workers is ensured.
本发明属于一种钢结构安装领域,具体的说是一种门式钢架厂房钢结构安装设备,包括钢轨;所述钢轨的顶面滑动连接有底座;所述底座两侧均连接有延展装置;两个所述延展装置的一侧固连有一对对称设置的支撑杆;所述支撑杆远离延展装置的一端开设有插孔;所述底座的顶面固连有支撑座;所述支撑座的顶面固连有卷线盘;所述卷线盘侧表面固连有线缆,首先将线缆固定在钢结构的顶部;再将钢结构的两条支柱通过插孔进行固定,此时工人启动卷线盘将钢结构拉起,再将支柱的底部与地基固定,进而完成钢结构的安装,通过线缆将钢结构拉起,方便了工人之后的固定,降低了钢结构在安装时倒塌的风险,保障了工人的生命安全。
Steel structure mounting equipment for portal steel frame plant
The invention belongs to the field of steel structure installation, and particularly relates to door-type steel frame plant steel structure installation equipment which comprises a steel rail. The top surface of the steel rail is slidably connected with a base; extension devices are connected to the two sides of the base; one side of each of the two extension devices is fixedly connected with a pair of symmetrically arranged supporting rods; an insertion hole is formed in one end, far away from the extension device, of the supporting rod; the top surface of the base is fixedly connected with a supporting seat; the top surface of the supporting seat is fixedly connected with a winding roll; the side surface of the winding roll is fixedly connected with a cable, and the cable is firstly fixed to the top of the steel structure; then two supporting columns of the steel structure are fixed through inserting holes, at the moment, a worker starts a winding roll to pull up the steel structure, then the bottoms of the supporting columns are fixed to a foundation, then installation of the steel structure is completed, the steel structure is pulled up through a cable, later fixing of the worker is facilitated, the risk that the steel structure collapses during installation is reduced, and the construction efficiency is improved. And the life safety of workers is ensured.
本发明属于一种钢结构安装领域,具体的说是一种门式钢架厂房钢结构安装设备,包括钢轨;所述钢轨的顶面滑动连接有底座;所述底座两侧均连接有延展装置;两个所述延展装置的一侧固连有一对对称设置的支撑杆;所述支撑杆远离延展装置的一端开设有插孔;所述底座的顶面固连有支撑座;所述支撑座的顶面固连有卷线盘;所述卷线盘侧表面固连有线缆,首先将线缆固定在钢结构的顶部;再将钢结构的两条支柱通过插孔进行固定,此时工人启动卷线盘将钢结构拉起,再将支柱的底部与地基固定,进而完成钢结构的安装,通过线缆将钢结构拉起,方便了工人之后的固定,降低了钢结构在安装时倒塌的风险,保障了工人的生命安全。
Steel structure mounting equipment for portal steel frame plant
一种门式钢架厂房钢结构安装设备
ZHAO FUYUAN (author) / GAO ZHUHAI (author) / HE QIWEI (author) / LU GANG (author) / YANG YI (author) / GUO YAZHOU (author) / XIE SHENGYAN (author) / WANG LIANYUE (author) / SONG WENCONG (author) / SHI WEN (author)
2022-09-09
Patent
Electronic Resource
Chinese
Stainless Steel Portal Frame Tests
Wiley | 2022
|Portal steel frame steel structure factory building easy to install
European Patent Office | 2023
|European Patent Office | 2016
|