The invention discloses an indoor rapid decoration method which comprises the following steps: material preparation: a decoration facing material is pre-processed in a factory to form a facing product, and the facing product is transported to a decoration site; dry construction is conducted, specifically, the machined facing product is fixed to a building body through an assembly type installation structural part; and pipeline separation is conducted, specifically, in the dry construction process, a pipeline space is reserved between the facing product and the building main body, a metal corrugated hose wrapped by leather is arranged on an electric and network cable in a sleeving mode to form a sleeve wire, and a PB water hose and the sleeve wire are arranged in the pipeline space in a shuttling mode. According to the indoor rapid decoration method, the efficiency of indoor decoration is improved, the environmental protection property and safety in the decoration process are improved, and meanwhile adjustment during later maintenance and overhaul is facilitated.
本申请公开了一种室内快速装修方法,该种方法包括以下步骤:物料预备:装饰饰面材料在工厂预先加工形成饰面部品,并将所述饰面部品运输至装修现场;干式施工:采用装配式的安装结构件把加工完的所述饰面部品固定在建筑主体上;管线分离:在所述干式施工过程中,所述饰面部品与所述建筑主体之间预留管线空间,通过皮质包裹的金属波纹软管套在电、网线上形成套管线材,将PB软水管及所述套管线材在所述管线空间内进行穿梭布设。本申请的室内快速装修方法,提高了室内装修的效率,以及装修过程中的环保性、安全性,同时,便于后期的维护、检修时的调整。
The invention discloses an indoor rapid decoration method which comprises the following steps: material preparation: a decoration facing material is pre-processed in a factory to form a facing product, and the facing product is transported to a decoration site; dry construction is conducted, specifically, the machined facing product is fixed to a building body through an assembly type installation structural part; and pipeline separation is conducted, specifically, in the dry construction process, a pipeline space is reserved between the facing product and the building main body, a metal corrugated hose wrapped by leather is arranged on an electric and network cable in a sleeving mode to form a sleeve wire, and a PB water hose and the sleeve wire are arranged in the pipeline space in a shuttling mode. According to the indoor rapid decoration method, the efficiency of indoor decoration is improved, the environmental protection property and safety in the decoration process are improved, and meanwhile adjustment during later maintenance and overhaul is facilitated.
本申请公开了一种室内快速装修方法,该种方法包括以下步骤:物料预备:装饰饰面材料在工厂预先加工形成饰面部品,并将所述饰面部品运输至装修现场;干式施工:采用装配式的安装结构件把加工完的所述饰面部品固定在建筑主体上;管线分离:在所述干式施工过程中,所述饰面部品与所述建筑主体之间预留管线空间,通过皮质包裹的金属波纹软管套在电、网线上形成套管线材,将PB软水管及所述套管线材在所述管线空间内进行穿梭布设。本申请的室内快速装修方法,提高了室内装修的效率,以及装修过程中的环保性、安全性,同时,便于后期的维护、检修时的调整。
Indoor rapid decoration method
一种室内快速装修方法
FU JINGSHAN (author)
2022-09-20
Patent
Electronic Resource
Chinese
IPC:
E04F
FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
,
Ausbau von Bauwerken, z.B. Treppen, Fußböden
/
H02G
INSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
,
Verlegen oder Installieren elektrischer Kabel oder Leitungen, Verlegen oder Installieren kombinierter optischer und elektrischer Kabel oder Leitungen