Construction method of composite heat preservation formwork
The invention belongs to the technical field of thermal insulation construction of constructional engineering, and discloses a construction method of a composite thermal insulation formwork, which specifically comprises the following steps: step S100, arranging an outer cantilever plate at each floor of a building; s200, an internal supporting system is built; step S300, typesetting of the thermal insulation template; s400, steel bars and a heat preservation formwork are transferred downwards from the top of the building; s500, an outer wall framework system is erected; s600, a heat preservation formwork is installed; and S700, an outer wall body is built. The construction method of the composite heat preservation formwork is suitable for construction of the composite heat preservation formwork of the super high-rise building, enough space is provided for splicing of the heat preservation formwork, high-altitude operation is reduced, the construction efficiency can be improved, the splicing effect of the heat preservation formwork is guaranteed, and potential safety hazards of operation are reduced.
本发明属于建筑工程保温施工技术领域,公开了一种复合保温模板的施工方法,其具体步骤包括:步骤S100、于建筑每层楼板处设置外悬挑板;步骤S200、搭建内部支撑体系;步骤S300、保温模板排版;步骤S400、自建筑顶部向下传递钢筋及保温模板;步骤S500、架设外墙骨架体系;步骤S600、安装保温模板;步骤S700、外墙墙体筑造。该复合保温模板的施工方法适用于超高层的复合保温模板施工的进行,为保温模板的拼装提供足够空间,减少高空作业,有利于提高施工效率并保证保温模板的拼装效果,减少作业安全隐患。
Construction method of composite heat preservation formwork
The invention belongs to the technical field of thermal insulation construction of constructional engineering, and discloses a construction method of a composite thermal insulation formwork, which specifically comprises the following steps: step S100, arranging an outer cantilever plate at each floor of a building; s200, an internal supporting system is built; step S300, typesetting of the thermal insulation template; s400, steel bars and a heat preservation formwork are transferred downwards from the top of the building; s500, an outer wall framework system is erected; s600, a heat preservation formwork is installed; and S700, an outer wall body is built. The construction method of the composite heat preservation formwork is suitable for construction of the composite heat preservation formwork of the super high-rise building, enough space is provided for splicing of the heat preservation formwork, high-altitude operation is reduced, the construction efficiency can be improved, the splicing effect of the heat preservation formwork is guaranteed, and potential safety hazards of operation are reduced.
本发明属于建筑工程保温施工技术领域,公开了一种复合保温模板的施工方法,其具体步骤包括:步骤S100、于建筑每层楼板处设置外悬挑板;步骤S200、搭建内部支撑体系;步骤S300、保温模板排版;步骤S400、自建筑顶部向下传递钢筋及保温模板;步骤S500、架设外墙骨架体系;步骤S600、安装保温模板;步骤S700、外墙墙体筑造。该复合保温模板的施工方法适用于超高层的复合保温模板施工的进行,为保温模板的拼装提供足够空间,减少高空作业,有利于提高施工效率并保证保温模板的拼装效果,减少作业安全隐患。
Construction method of composite heat preservation formwork
一种复合保温模板的施工方法
ZHOU GUANGSHENG (author) / WANG LIFENG (author) / ZHANG YAN (author) / JIN WEITONG (author)
2022-09-20
Patent
Electronic Resource
Chinese
European Patent Office | 2020
|Disassembly-free composite heat preservation formwork and construction method thereof
European Patent Office | 2021
|European Patent Office | 2015
|European Patent Office | 2022
|