A platform for research: civil engineering, architecture and urbanism
Fabricated tempered glass curtain wall of building outer wall
The building outer wall assembly type tempered glass curtain wall comprises a vertical frame and a transverse frame, first connecting mechanisms are symmetrically arranged on the outer side of the vertical frame, and second connecting mechanisms are arranged at the lower ends of the first connecting mechanisms. During installation, the first installation blocks are installed on the wall surface through the installation holes, then the aluminum alloy vertical frames are inserted into the installation grooves in the front faces of the first installation blocks, and finally the aluminum alloy vertical frames are fixed through the first fixing bolts. Then, the second mounting block at the lower end of the first mounting block is pulled out of the moving groove of the first mounting block, the second mounting block is inserted into the transverse frame through the positioning block, and finally, the two sides of the second mounting block are fixed through the second fixing bolt and the third fixing bolt, so that the frame of the curtain wall can be conveniently and quickly assembled; welding is not needed in the whole process, and assembling efficiency is high.
本发明公开了一种建筑外墙装配式钢化玻璃幕墙,包括竖框和横框,所述竖框的外侧对称设有第一连接机构,所述第一连接机构的下端设有第二连接机构。将第一安装块通过安装孔安装在墙面上,然后将铝合金竖框插接在和第一安装块正面的安装槽上后,最后通过第一固定螺栓进行固定即可,而在对横框进行安装时,将横框插接在竖框之间,然后将第一安装块下端的第二安装块从第一安装块的移槽中拉出,首先通过定位块插入到横框上,最后分别通过第二固定螺栓和第三固定螺栓对第二安装块进行两边固定即可,从而可以方便对该幕墙的框架进行快速装配,而且全程无需焊接,装配效率高。
Fabricated tempered glass curtain wall of building outer wall
The building outer wall assembly type tempered glass curtain wall comprises a vertical frame and a transverse frame, first connecting mechanisms are symmetrically arranged on the outer side of the vertical frame, and second connecting mechanisms are arranged at the lower ends of the first connecting mechanisms. During installation, the first installation blocks are installed on the wall surface through the installation holes, then the aluminum alloy vertical frames are inserted into the installation grooves in the front faces of the first installation blocks, and finally the aluminum alloy vertical frames are fixed through the first fixing bolts. Then, the second mounting block at the lower end of the first mounting block is pulled out of the moving groove of the first mounting block, the second mounting block is inserted into the transverse frame through the positioning block, and finally, the two sides of the second mounting block are fixed through the second fixing bolt and the third fixing bolt, so that the frame of the curtain wall can be conveniently and quickly assembled; welding is not needed in the whole process, and assembling efficiency is high.
本发明公开了一种建筑外墙装配式钢化玻璃幕墙,包括竖框和横框,所述竖框的外侧对称设有第一连接机构,所述第一连接机构的下端设有第二连接机构。将第一安装块通过安装孔安装在墙面上,然后将铝合金竖框插接在和第一安装块正面的安装槽上后,最后通过第一固定螺栓进行固定即可,而在对横框进行安装时,将横框插接在竖框之间,然后将第一安装块下端的第二安装块从第一安装块的移槽中拉出,首先通过定位块插入到横框上,最后分别通过第二固定螺栓和第三固定螺栓对第二安装块进行两边固定即可,从而可以方便对该幕墙的框架进行快速装配,而且全程无需焊接,装配效率高。
Fabricated tempered glass curtain wall of building outer wall
一种建筑外墙装配式钢化玻璃幕墙
WAN XIAOFENG (author)
2022-09-27
Patent
Electronic Resource
Chinese
Building outer wall assembly type tempered glass curtain wall
European Patent Office | 2020
|