Automatic protection structure for horizontal hole of aluminum mold material conveying system and construction method
The invention discloses an automatic protection structure for a horizontal hole of an aluminum mold material conveying system and a construction method, and belongs to the technical field of aluminum mold construction safety. The automatic protection structure comprises a structure body installed in a concrete plate material conveying hole, and the structure body comprises two fixing frames; the protective cover plate is arranged on the upper portions of the two fixing frames and movably connected with one fixing frame, the two fixing frames are symmetrically arranged, a plurality of puller bolts are arranged on the fixing frames, and the fixing frames are fixedly connected with the inner wall of a concrete slab conveying hole through the puller bolts. And a connecting piece is arranged between the protective cover plate and one of the fixing frames. Under the condition that the normal use function of the aluminum mold material conveying opening is not affected, hole protection after each time of material conveying can be automatically completed, so that the safety problem caused by the fact that protection of the material conveying opening is not in place in the operation process is solved, and the aluminum mold material conveying opening protection device is reasonable in structural design, convenient and rapid to disassemble and capable of being repeatedly used.
本发明公开了一种铝模传料系统水平洞口自动防护结构及施工方法,属于铝模施工安全技术领域,包括安装在混凝土板传料洞口内的结构本体,所述结构本体包括两个固定框,以及设置于两个固定框上部并与其中一个固定框活动连接的防护盖板,两个所述固定框呈对称设置,且固定框上设有多个顶紧螺栓,通过多个所述顶紧螺栓与混凝土板传料洞口内壁连接固定,所述防护盖板与其中一个固定框间设置有连接件。本发明能够在不影响铝模传料口正常使用功能情况下,自动完成每一次传料后的洞口防护,从而消弥因传料口在作业过程中防护不到位产生的安全问题,并且结构设计合理,拆卸方便快捷,可以进行重复使用。
Automatic protection structure for horizontal hole of aluminum mold material conveying system and construction method
The invention discloses an automatic protection structure for a horizontal hole of an aluminum mold material conveying system and a construction method, and belongs to the technical field of aluminum mold construction safety. The automatic protection structure comprises a structure body installed in a concrete plate material conveying hole, and the structure body comprises two fixing frames; the protective cover plate is arranged on the upper portions of the two fixing frames and movably connected with one fixing frame, the two fixing frames are symmetrically arranged, a plurality of puller bolts are arranged on the fixing frames, and the fixing frames are fixedly connected with the inner wall of a concrete slab conveying hole through the puller bolts. And a connecting piece is arranged between the protective cover plate and one of the fixing frames. Under the condition that the normal use function of the aluminum mold material conveying opening is not affected, hole protection after each time of material conveying can be automatically completed, so that the safety problem caused by the fact that protection of the material conveying opening is not in place in the operation process is solved, and the aluminum mold material conveying opening protection device is reasonable in structural design, convenient and rapid to disassemble and capable of being repeatedly used.
本发明公开了一种铝模传料系统水平洞口自动防护结构及施工方法,属于铝模施工安全技术领域,包括安装在混凝土板传料洞口内的结构本体,所述结构本体包括两个固定框,以及设置于两个固定框上部并与其中一个固定框活动连接的防护盖板,两个所述固定框呈对称设置,且固定框上设有多个顶紧螺栓,通过多个所述顶紧螺栓与混凝土板传料洞口内壁连接固定,所述防护盖板与其中一个固定框间设置有连接件。本发明能够在不影响铝模传料口正常使用功能情况下,自动完成每一次传料后的洞口防护,从而消弥因传料口在作业过程中防护不到位产生的安全问题,并且结构设计合理,拆卸方便快捷,可以进行重复使用。
Automatic protection structure for horizontal hole of aluminum mold material conveying system and construction method
一种铝模传料系统水平洞口自动防护结构及施工方法
SHEN TIANBAO (author) / CHEN JINGLEI (author) / JIANG DONGYUN (author) / LIU SHIWEI (author) / ZHANG LE (author)
2022-09-27
Patent
Electronic Resource
Chinese
IPC:
E04G
SCAFFOLDING
,
Baugerüste
Aluminum mold material conveying device and material conveying method
European Patent Office | 2023
|Protection system for horizontal hole in building construction process and construction method
European Patent Office | 2021
|European Patent Office | 2024
|Hole-opening-free cantilever scaffold construction method suitable for aluminum mold
European Patent Office | 2022
|