A platform for research: civil engineering, architecture and urbanism
Embedded part construction method
The invention discloses an embedded part construction method, which is applied to the technical field of buildings and comprises the following steps: acquiring a target embedded part mounting position of a target embedded part, and mounting the target embedded part according to the target embedded part mounting position; the positioning support is installed according to the support installation position, determined by the target embedded part installation position, of the positioning support; when it is detected that the position of the target embedded part deviates, position correction is conducted on all the target embedded parts; when it is detected that the positioning supports deviate, the positions of the positioning supports are corrected; and concrete pouring is conducted on all the target embedded parts and all the positioning supports. The technical problem that the construction quality is poor is solved.
本申请公开了一种预埋件施工方法,应用于建筑技术领域,所述一种预埋件施工方法包括:获取目标预埋件的目标埋件安装位置,并依据所述目标埋件安装位置安装所述目标预埋件;依据所述目标埋件安装位置确定的定位支架的支架安装位置,安装所述定位支架;在检测到所述目标预埋件发生位置偏移时,对各所述目标预埋件进行位置校正;在检测到所述定位支架发生位置偏移时,对各所述定位支架进行位置校正;对各所述目标预埋件和各所述定位支架进行混凝土浇筑。本申请解决了施工质量差的技术问题。
Embedded part construction method
The invention discloses an embedded part construction method, which is applied to the technical field of buildings and comprises the following steps: acquiring a target embedded part mounting position of a target embedded part, and mounting the target embedded part according to the target embedded part mounting position; the positioning support is installed according to the support installation position, determined by the target embedded part installation position, of the positioning support; when it is detected that the position of the target embedded part deviates, position correction is conducted on all the target embedded parts; when it is detected that the positioning supports deviate, the positions of the positioning supports are corrected; and concrete pouring is conducted on all the target embedded parts and all the positioning supports. The technical problem that the construction quality is poor is solved.
本申请公开了一种预埋件施工方法,应用于建筑技术领域,所述一种预埋件施工方法包括:获取目标预埋件的目标埋件安装位置,并依据所述目标埋件安装位置安装所述目标预埋件;依据所述目标埋件安装位置确定的定位支架的支架安装位置,安装所述定位支架;在检测到所述目标预埋件发生位置偏移时,对各所述目标预埋件进行位置校正;在检测到所述定位支架发生位置偏移时,对各所述定位支架进行位置校正;对各所述目标预埋件和各所述定位支架进行混凝土浇筑。本申请解决了施工质量差的技术问题。
Embedded part construction method
一种预埋件施工方法
LI JIGUANG (author) / LIU XIAOSONG (author)
2022-09-30
Patent
Electronic Resource
Chinese
Combined clamping plate embedded part and embedded part construction method
European Patent Office | 2021
|UHPC embedded part and UHPC embedded part construction method and device
European Patent Office | 2024
|Embedded part of vertical actuator and construction method of embedded part
European Patent Office | 2021
|