A platform for research: civil engineering, architecture and urbanism
Rail-changeable hoisting platform for steel structure construction
The rail-changeable hoisting platform for steel structure construction comprises a first rail, a second rail, a third rail and a fourth rail which are arranged in parallel and in sequence, and one ends of the first rail, the second rail, the third rail and the fourth rail are connected through a fixing plate; the other end of the first track, the other end of the second track, the other end of the third track and the other end of the fourth track are connected through a transition track, a track transfer mechanism is arranged at the intersection of the second track and the transition track, and a track transfer mechanism is also arranged at the intersection of the third track and the transition track. Wherein one self-propelled trolley can move in the fourth track, the other two self-propelled trolleys can freely move in the first track, the second track, the third track and the transition track, and the self-propelled trolleys are used for hanging the lifting basket assembly. Large-range construction of the steel structure can be conducted, meanwhile, rail replacement is achieved in the air, and construction convenience and efficiency are improved.
本发明一种用于钢结构施工的可变轨吊装平台,包括平行且依次设置的第一轨道、第二轨道、第三轨道和第四轨道,第一轨道、第二轨道、第三轨道和第四轨道的一端通过固定板连接,第一轨道、第二轨道、第三轨道和第四轨道的另一端通过过渡轨道连接,第二轨道和过渡轨道的交汇处设有变轨机构,第三轨道和过渡轨道的交汇处也设有变轨机构,用于钢结构施工的可变轨吊装平台,还包括三个沿轨道运动的自行小车,其中一个自行小车可在第四轨道内运动,另外两个自行小车可在第一轨道、第二轨道、第三轨道、过渡轨道内自由运动,自行小车用于悬挂升降吊篮总成。本发明能够进行钢结构大范围施工,同时,在空中实现换轨,提高了施工的便捷性和效率。
Rail-changeable hoisting platform for steel structure construction
The rail-changeable hoisting platform for steel structure construction comprises a first rail, a second rail, a third rail and a fourth rail which are arranged in parallel and in sequence, and one ends of the first rail, the second rail, the third rail and the fourth rail are connected through a fixing plate; the other end of the first track, the other end of the second track, the other end of the third track and the other end of the fourth track are connected through a transition track, a track transfer mechanism is arranged at the intersection of the second track and the transition track, and a track transfer mechanism is also arranged at the intersection of the third track and the transition track. Wherein one self-propelled trolley can move in the fourth track, the other two self-propelled trolleys can freely move in the first track, the second track, the third track and the transition track, and the self-propelled trolleys are used for hanging the lifting basket assembly. Large-range construction of the steel structure can be conducted, meanwhile, rail replacement is achieved in the air, and construction convenience and efficiency are improved.
本发明一种用于钢结构施工的可变轨吊装平台,包括平行且依次设置的第一轨道、第二轨道、第三轨道和第四轨道,第一轨道、第二轨道、第三轨道和第四轨道的一端通过固定板连接,第一轨道、第二轨道、第三轨道和第四轨道的另一端通过过渡轨道连接,第二轨道和过渡轨道的交汇处设有变轨机构,第三轨道和过渡轨道的交汇处也设有变轨机构,用于钢结构施工的可变轨吊装平台,还包括三个沿轨道运动的自行小车,其中一个自行小车可在第四轨道内运动,另外两个自行小车可在第一轨道、第二轨道、第三轨道、过渡轨道内自由运动,自行小车用于悬挂升降吊篮总成。本发明能够进行钢结构大范围施工,同时,在空中实现换轨,提高了施工的便捷性和效率。
Rail-changeable hoisting platform for steel structure construction
一种用于钢结构施工的可变轨吊装平台
ZHANG LEI (author) / ZHANG QI (author) / ZHANG ZAN (author) / WU ZHUANGJU (author) / LIU HUI (author)
2022-10-11
Patent
Electronic Resource
Chinese
IPC:
B66F
HOISTING, LIFTING, HAULING, OR PUSHING, NOT OTHERWISE PROVIDED FOR, e.g. DEVICES WHICH APPLY A LIFTING OR PUSHING FORCE DIRECTLY TO THE SURFACE OF A LOAD
,
Hub-, Verhol- oder Schubvorrichtungen, soweit nicht anderweitig vorgesehen, z.B. Vorrichtungen mit unmittelbarer Krafteinwirkung auf die Last
/
E04G
SCAFFOLDING
,
Baugerüste
Hoisting construction method using steel trestle as construction platform
European Patent Office | 2024
|Construction method for hoisting platform steel upright post
European Patent Office | 2020
|