The invention provides a cross beam pouring mold, and relates to the technical field of building construction, the cross beam pouring mold comprises a bearing beam, the top of the bearing beam is provided with a pouring bearing wall, the two side edges of the top of the bearing beam are both provided with beam side plates, and a positioning assembly is detachably clamped between the two beam side plates; connecting structures used for being detachably connected with the outside are arranged at the two ends of the cross beam pouring mold correspondingly. After being assembled, the whole cross beam pouring mold is lifted through a lifting machine or a forklift or other tools and is connected with an external structure through a connecting structure, steel bars are erected between the two beam side plates, concrete is poured, and pouring of the cross beam is achieved. The whole cross beam pouring mold is arranged at a specific position after being assembled, on-site scattered splicing does not need to be carried out at the position higher than a construction site, and construction is convenient. When demolding is needed, the cross beam pouring mold is lifted through a lifting machine or a forklift or other tools, the positioning assemblies and the beam side plates are detached, then the cross beam pouring mold is detached from an external structure, and the lifting machine or the forklift drives the cross beam pouring mold to move downwards.
本发明提出了一种横梁浇筑模具,涉及建筑施工技术领域,包括承载梁,承载梁的顶部具有浇筑承载壁,承载梁顶部的两侧边沿均安装有梁侧板,两个梁侧板之间可拆卸夹持有定位组件,横梁浇筑模具的两端均开设有用于与外部可拆卸连接的连接结构。整个横梁浇筑模具组装后通过升降机或叉车等工具抬升,并通过连接结构与外部结构连接,通过在两个梁侧板之间架设钢筋并浇筑混凝土,实现横梁的浇筑。整个横梁浇筑模具组装后再布置到特定位置,无需在施工现场的高出进行现场散拼,方便施工。当需要脱模时,通过升降机或叉车等工具将横梁浇筑模具托举住,将定位组件与梁侧板拆卸,再将横梁浇筑模具与外部结构拆卸,升降机或叉车带动横梁浇筑模具下移即可。
The invention provides a cross beam pouring mold, and relates to the technical field of building construction, the cross beam pouring mold comprises a bearing beam, the top of the bearing beam is provided with a pouring bearing wall, the two side edges of the top of the bearing beam are both provided with beam side plates, and a positioning assembly is detachably clamped between the two beam side plates; connecting structures used for being detachably connected with the outside are arranged at the two ends of the cross beam pouring mold correspondingly. After being assembled, the whole cross beam pouring mold is lifted through a lifting machine or a forklift or other tools and is connected with an external structure through a connecting structure, steel bars are erected between the two beam side plates, concrete is poured, and pouring of the cross beam is achieved. The whole cross beam pouring mold is arranged at a specific position after being assembled, on-site scattered splicing does not need to be carried out at the position higher than a construction site, and construction is convenient. When demolding is needed, the cross beam pouring mold is lifted through a lifting machine or a forklift or other tools, the positioning assemblies and the beam side plates are detached, then the cross beam pouring mold is detached from an external structure, and the lifting machine or the forklift drives the cross beam pouring mold to move downwards.
本发明提出了一种横梁浇筑模具,涉及建筑施工技术领域,包括承载梁,承载梁的顶部具有浇筑承载壁,承载梁顶部的两侧边沿均安装有梁侧板,两个梁侧板之间可拆卸夹持有定位组件,横梁浇筑模具的两端均开设有用于与外部可拆卸连接的连接结构。整个横梁浇筑模具组装后通过升降机或叉车等工具抬升,并通过连接结构与外部结构连接,通过在两个梁侧板之间架设钢筋并浇筑混凝土,实现横梁的浇筑。整个横梁浇筑模具组装后再布置到特定位置,无需在施工现场的高出进行现场散拼,方便施工。当需要脱模时,通过升降机或叉车等工具将横梁浇筑模具托举住,将定位组件与梁侧板拆卸,再将横梁浇筑模具与外部结构拆卸,升降机或叉车带动横梁浇筑模具下移即可。
Cross beam pouring mold
一种横梁浇筑模具
XU ZHENJIA (author)
2022-10-11
Patent
Electronic Resource
Chinese
IPC:
E04G
SCAFFOLDING
,
Baugerüste
Pouring mold for water-cooled beam stand column castable and construction method of pouring mold