The invention relates to a construction method of an independent, special-shaped and variable-diameter fair-faced concrete column. Comprising the steps of (1) operation frame erecting, (1.1) positioning paying-off and elevation transferring, (1.2) lantern frame erecting, (2) formwork erecting, (2.1) formwork machining, (2.2) formwork installing, (3) bare concrete pouring, (3.1) pouring and (3.2) formwork removing and maintaining. By means of the method, the construction quality of the special-shaped column can be guaranteed, the construction time of formwork installation is shortened compared with that of a customized formwork, the clear water appearance is good after pouring and curing are completed, and the aspects of turnover, manpower and material resource saving and material turnover time shortening of the frame body and formwork materials are values which cannot be achieved through a traditional column construction method.
本发明是一种独立、异形、变径的清水混凝土柱的建造方法;包括步骤1、搭设操作架、步骤1.1、定位放线,标高传递、步骤1.2、搭设灯笼架、步骤2、模板支设、步骤2.1、模板加工、步骤2.2、模板安装、步骤3、清水混凝土浇筑、步骤3.1、浇筑、步骤3.2、拆模与养护;使用本方法可以保证异形柱的施工质量,不仅模板安装比定制模板缩短施工时间,而且浇筑养护完成后清水观感好,架体、模板材料可用于周转,节省人力、物力,缩短材料周转时间这些方面,是传统柱子施工方法无法实现的值。
Construction method of independent special-shaped bare concrete column
The invention relates to a construction method of an independent, special-shaped and variable-diameter fair-faced concrete column. Comprising the steps of (1) operation frame erecting, (1.1) positioning paying-off and elevation transferring, (1.2) lantern frame erecting, (2) formwork erecting, (2.1) formwork machining, (2.2) formwork installing, (3) bare concrete pouring, (3.1) pouring and (3.2) formwork removing and maintaining. By means of the method, the construction quality of the special-shaped column can be guaranteed, the construction time of formwork installation is shortened compared with that of a customized formwork, the clear water appearance is good after pouring and curing are completed, and the aspects of turnover, manpower and material resource saving and material turnover time shortening of the frame body and formwork materials are values which cannot be achieved through a traditional column construction method.
本发明是一种独立、异形、变径的清水混凝土柱的建造方法;包括步骤1、搭设操作架、步骤1.1、定位放线,标高传递、步骤1.2、搭设灯笼架、步骤2、模板支设、步骤2.1、模板加工、步骤2.2、模板安装、步骤3、清水混凝土浇筑、步骤3.1、浇筑、步骤3.2、拆模与养护;使用本方法可以保证异形柱的施工质量,不仅模板安装比定制模板缩短施工时间,而且浇筑养护完成后清水观感好,架体、模板材料可用于周转,节省人力、物力,缩短材料周转时间这些方面,是传统柱子施工方法无法实现的值。
Construction method of independent special-shaped bare concrete column
一种独立异形清水混凝土柱的建造方法
RAO WUBIN (author) / MO CAIJUN (author) / LIU HONGLIANG (author) / XIANG YONG (author) / YANG ZEMIN (author) / CHEN LIANJIAN (author)
2022-10-11
Patent
Electronic Resource
Chinese
Construction method of curved-surface special-shaped facing bare concrete canopy
European Patent Office | 2024
|Special-shaped steel pipe column concrete construction structure and construction method
European Patent Office | 2022
|Shaped steel mold large-section stiff bare concrete column structure
European Patent Office | 2023
|European Patent Office | 2020
|